About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

One cubic yard covers about 324 square feet at a 1 inch depth, so a small patio or walkway base often needs just a partial yard, while mortar mixing for a full brick chimney repair can use up a yard fast depending on batch size. Typical install depth runs 1 to 2 inches, so figure your square footage first and adjust from there. Because this material is dense at 1.35 tons per cubic yard, even a modest order adds up in weight, which matters if you are hauling it yourself in a truck bed.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Akron Sand Delivery

Akron Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

One cubic yard covers about 324 square feet at a 1 inch depth, so a small patio or walkway base often needs just a partial yard, while mortar mixing for a full brick chimney repair can use up a yard fast depending on batch size. Typical install depth runs 1 to 2 inches, so figure your square footage first and adjust from there. Because this material is dense at 1.35 tons per cubic yard, even a modest order adds up in weight, which matters if you are hauling it yourself in a truck bed.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Akron Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Sand pairs naturally with paver base gravel underneath and edging to hold the joints in place once they are swept in. For mortar work, crews usually already have cement and lime on hand, they just need the sand delivered in bulk to avoid running out mid mix. If you are leaning toward pavers instead of a poured patio, ask about chip stone too, since it is increasingly used in place of sand for joint fill.

Mulch Mound Pro Tip

Washed mason sand can still hold moisture when it arrives, especially during Akron's wetter spring stretch. If you are mixing mortar the same day, account for that extra water in your mix or the batch will run too wet and weak. Letting the pile sit uncovered for a day in dry weather, or spreading it out, helps it dry to a more workable consistency before you start troweling brick or block joints.

Mulch Mound Pro Tip

A common mistake on paver projects is using this fine sand for joint fill and then watching it wash out after a hard rain, which happens more than people expect given Akron's clay loam runoff patterns. Polymeric sand or chip stone holds up better in joints exposed to weather. Save the washed sand for mortar mixing or as a leveling bed under pavers, not as the final joint filler if you want it to last.

Mulch Mound Pro Tip

If your project needs both a paver base and mortar for a retaining wall cap, order enough sand for both uses at once instead of two separate deliveries, since it saves a trip and lets you keep leftover material on site for touch ups. Cubic yard pricing scales better in one larger order than in repeated small ones, and excess sand stores fine in a covered pile until the next phase.

Working With Sand in Akron

Akron sits on clay loam soil that drains slowly, which is exactly why sand shows up in so many hardscape plans here, it gives water somewhere to go under a patio or paver base instead of pooling against the clay. With a growing season bounded by a May 5 last frost and an October 5 first frost, most sand deliveries land between late spring and early fall when masonry and hardscape crews are actually working. Contractors around Rubber City still spec this finer sand for mortar mixing on brick repairs, since coarser material makes the mix hard to trowel. For paver joints, some crews are switching to chip stone instead, since it does not wash out or pump up between the pavers the way sand can.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand?

Yes, this is washed and finely screened sand, the same material commonly called mason sand in other parts of the country. It is finer and more uniform than concrete sand, which is what makes it workable for mortar mixing and gives it a smooth finish in paver joints or as a leveling bed.

Answer

How many cubic yards do I need for a small patio base?

One cubic yard covers roughly 324 square feet at a 1 inch depth, so a typical 150 to 200 square foot patio base often needs well under a full yard. Measure your patio footprint and multiply by your planned depth in inches to get a closer estimate before ordering.

Answer

When is the best time to install sand for a hardscape project in Akron?

Hardscape and mortar work generally runs from after the last frost around May 5 through before the first frost around October 5, since that is when crews and DIYers are actively building patios, walls, and walkways. Ordering sand right before you plan to install avoids storing it through winter freeze and thaw cycles.

Answer

Where will the sand be placed when it is delivered?

The load is dropped wherever there is clear truck access on your property, typically a driveway or a flat area near the work site. Since delivery is scheduled at checkout without a specific arrival window promised, make sure the drop spot is cleared and accessible ahead of time so the driver can place it without obstruction.

Answer

Should I use sand or chip stone for paver joints?

Sand has traditionally filled paver joints, but chip stone is increasingly used instead because it does not wash out or pump up under freeze thaw cycles the way sand can. If your project is mortar mixing or a paver bedding layer, sand still makes sense, but for the final joint fill, chip stone may hold up better long term.

More delivery around Akron, Ohio

All Akron, Ohio landscape supply