About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a small low spot might take a single yard while a foundation backfill or pool surround can run several yards fast. Plan your total depth first, typically 6 to 12 inches per lift, then work backward to figure yardage rather than guessing at a pile size. Since it is sold by the cubic yard, measure the area and depth of the actual void you are filling, not the finished surface.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Albany Fill Dirt Delivery

Albany Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a small low spot might take a single yard while a foundation backfill or pool surround can run several yards fast. Plan your total depth first, typically 6 to 12 inches per lift, then work backward to figure yardage rather than guessing at a pile size. Since it is sold by the cubic yard, measure the area and depth of the actual void you are filling, not the finished surface.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Albany Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a few inches of topsoil on top, since fill alone will not support grass or plant roots. If you are leveling a yard for lawn, pair your fill order with topsoil for the top layer, and consider mulch for any beds you are reshaping at the same time. It saves a second delivery trip once the grading work is already underway.

Mulch Mound Pro Tip

In Albany's clay soil, do not dump fill dirt in one deep pour and walk away. Place it in 6 to 8 inch lifts and compact each one with a plate compactor or hand tamper before adding the next layer. Skip this step and you will watch that spot sink an inch or two over the next couple winters as freeze thaw cycles work through the loose fill, which is a common callback we see on foundation backfill jobs around the older parts of the city.

Mulch Mound Pro Tip

Time fill dirt work for a stretch without heavy rain, since Albany clay turns greasy and hard to compact when wet. Late spring after the May 1 frost date through early fall gives you the widest window of workable, dry conditions. If you are backfilling before winter, get it compacted and capped well before the Oct 10 average first frost so the ground has time to settle before it freezes solid.

Mulch Mound Pro Tip

Order fill dirt and topsoil together if you are grading a lawn area, since fill handles the structural build up and topsoil caps it for planting, and combining loads on one delivery is more efficient than two separate trips. For pool or foundation backfill where nothing needs to grow, skip the topsoil layer entirely and put that budget toward proper compaction instead.

Grading and Filling in Albany

Albany sits on heavy clay, and clay does not drain, it just holds water until something changes the grade. That means backfill jobs around foundations, patios, and pools need real structural fill, not just whatever soil got dug out of the hole. With a last frost around May 1 and a first frost near Oct 10, Albany has a workable season long enough to compact fill in stages and still get topsoil and grass established before the ground freezes. Builders here also deal with older homes near downtown and the Capitol where original grading has settled over decades, and fill dirt is what levels that back out.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to grow grass or a garden bed directly on top of it?

No, fill dirt is a structural subsoil meant for raising grade and backfilling, not a growing medium. Cap it with several inches of topsoil before seeding grass or planting anything, since fill dirt alone is too dense and low in organic matter to support root growth well.

Answer

How many cubic yards of fill dirt do I need for a small backyard low spot?

One cubic yard covers about 54 square feet at a 6 inch depth, so a low spot roughly 10 by 10 feet at that depth would need about 2 cubic yards. Measure your actual area and target depth, then divide by 54 to estimate yardage for a 6 inch fill.

Answer

When is the best time to bring in fill dirt in Albany?

Anytime after the ground thaws in spring through fall works, ideally during a dry stretch since Albany's clay soil compacts poorly when wet. If you are filling before winter, finish compaction well ahead of the average Oct 10 first frost so the fill has time to settle before freezing.

Answer

Where will the fill dirt be placed on delivery day?

Our truck places the load as close to your work area as driveway and yard access allow, so let us know about gates, low branches, or tight access when you order. Since fill dirt is sold and delivered heavy, we place it once, so clear the drop area ahead of time.

Answer

What is the difference between fill dirt and topsoil for my project?

Fill dirt is subsoil screened of debris, used for structural work like raising grade or backfilling around foundations and pools, it is not meant to grow anything. Topsoil has organic matter and goes on top as the final layer where grass, plants, or gardens need to establish roots.

More delivery around Albany, New York

All Albany, New York landscape supply