About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

One cubic yard of mason sand covers about 324 square feet at a 1 inch depth, and most mortar or joint fill jobs only need 1 to 2 inches of material. For a typical patio joint fill or mortar batch job, figure your square footage, decide on 1 or 2 inch depth depending on the application, and order in full cubic yards since partial loads are hard to schedule efficiently.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Asheville Sand Delivery

Asheville Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

One cubic yard of mason sand covers about 324 square feet at a 1 inch depth, and most mortar or joint fill jobs only need 1 to 2 inches of material. For a typical patio joint fill or mortar batch job, figure your square footage, decide on 1 or 2 inch depth depending on the application, and order in full cubic yards since partial loads are hard to schedule efficiently.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Asheville Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Mason sand pairs naturally with pavers, natural stone, and brick, and most jobs also need crushed stone base material underneath for drainage and stability, especially in Asheville's clay heavy, water retentive loam. If you are mixing mortar for a stone wall or walkway, you will also want cement on hand before the sand arrives.

Map of the sand delivery area around Asheville, North Carolina

Service area

Areas we deliver sand in Asheville, North Carolina

Mulch Mound Pro Tip

In Asheville's hillier neighborhoods, sand placement matters as much as sand quality. If your patio or wall sits on a grade, compact a gravel base first and use the mason sand only as the thin bedding or joint layer, not as fill for elevation changes. Sand alone shifts under freeze thaw cycles at this elevation, and 2,134 feet means colder nights than the surrounding valley, so let the gravel do the structural work.

Mulch Mound Pro Tip

A common mistake is ordering mason sand for paver bedding when clean chip stone would hold up better long term. Mason sand is excellent for mortar and tight joints, but as a bedding layer it can pump out over time, especially with Asheville's periodic heavy rain. If your project is a paver patio rather than a mortared surface, ask about chip stone for the base course.

Mulch Mound Pro Tip

If your project involves both mortar work and joint filling, order mason sand as one combined load rather than splitting orders, it saves on delivery trips and keeps your timeline tighter during the busy spring and fall hardscape season when schedules fill up fast around the city.

Working With Sand in Asheville

Asheville's native soil is acidic loam, fine textured and prone to holding water, which is exactly why mason sand shows up on so many job sites here, not in the yard but under the patio. At 2,134 feet with a growing season bounded by an April 20 last frost and an October 15 first frost, hardscape crews have a real spring through fall window and want material that performs the first time. Mason sand does not touch planting beds much in this climate, it is a build material, used to bed pavers, fill joints, and mix mortar for the stone work common around the Biltmore Estate area and older stone foundations citywide. Its fine, uniform grain is what keeps mortar from getting gritty and hard to trowel.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is mason sand the same as what people call sand box sand or play sand here?

No, mason sand is washed and screened for construction use, it is coarser and more consistent than play sand and is meant for mortar mixing, paver joints, and pool bases, not for kids' play areas. If you need something soft and rounded for a play space, ask about a different product before ordering.

Answer

How many cubic yards do I need for a 400 square foot paver patio?

At a 1 inch bedding or joint fill depth, one cubic yard covers about 324 square feet, so a 400 square foot patio needs roughly 1.25 cubic yards. Round up to 1.5 yards to cover waste and uneven spreading, especially on a sloped Asheville lot.

Answer

When is the best time to schedule a mortar or paver project in Asheville?

Most hardscape work here runs spring through fall, after the April 20 last frost and before conditions turn in October. Mortar cures poorly in cold, wet weather, so timing your delivery for a stretch of mild days improves the finished result and gives the mix time to set properly.

Answer

Can the delivery truck get up my driveway if it's steep or narrow?

In many Asheville neighborhoods, driveways are steep or tight, so let us know about grade, width, or low branches when you schedule. We place the load as close to your work area as access allows, and clearing space in advance keeps delivery day quick and avoids having to hand carry material further than necessary.

Answer

Should I use mason sand or regular sand for my paver patio base?

For paver bedding specifically, many contractors now use clean chip stone instead of mason sand, since chip stone does not pump or wash out over time. Mason sand is still the right call for mortar mixing and tight paver joints. Tell us your specific use and we can help you order the right material.

More delivery around Asheville, North Carolina

All Asheville, North Carolina landscape supply