About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

At a 1 inch depth, one cubic yard covers about 324 square feet, so a typical paver patio or pool base project usually lands somewhere between half a yard and two yards depending on footprint. Since install depth for this material runs 1 to 2 inches, doubling the depth roughly halves your coverage per yard, so measure your area first and decide how thick the layer needs to be before ordering. Rounding up slightly is smart since running short mid mortar mix is a bigger headache than having a little extra on the pallet.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Billings Sand Delivery

Billings Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

At a 1 inch depth, one cubic yard covers about 324 square feet, so a typical paver patio or pool base project usually lands somewhere between half a yard and two yards depending on footprint. Since install depth for this material runs 1 to 2 inches, doubling the depth roughly halves your coverage per yard, so measure your area first and decide how thick the layer needs to be before ordering. Rounding up slightly is smart since running short mid mortar mix is a bigger headache than having a little extra on the pallet.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Billings Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Mason sand is usually just one layer in a bigger system. Most Billings jobs pair it with a compacted gravel base underneath for drainage through clay loam, and edge restraint or paver stone on top to lock the whole thing in place. If you are mixing mortar for a stone veneer wall near Pictograph Cave style landscaping, having cement and sand delivered together on the same day saves a trip.

Mulch Mound Pro Tip

Mason sand's fine, uniform grain is what makes it workable for mortar, but that same fineness means it holds moisture longer than coarser sands. If you are mixing mortar in early spring while Billings nights are still near freezing, keep the pile covered so it does not freeze into a solid clump overnight. A frozen pile can take half a day to thaw enough to shovel and mix properly.

Mulch Mound Pro Tip

A common mistake on paver jobs is using mason sand as the bedding layer under the pavers themselves. It is finer than concrete sand and can pump up through joints under freeze thaw cycling, which Billings gets plenty of between October and April. Many contractors now use clean chip stone for bedding and save mason sand strictly for joint fill and mortar work.

Mulch Mound Pro Tip

If your project needs both mortar sand and gravel base material, order them together for the same delivery window rather than staggering deliveries across separate weekends. It cuts down on truck trips onto your property, which matters if your access is a narrow driveway, and it keeps the whole job moving while the weather window between May and September stays workable.

Working With Sand in Billings

Billings sits on clay loam that holds water and shifts a little through freeze and thaw, which is exactly why a lot of hardscape work here leans on a stable, well drained sand base rather than trusting native soil to stay put under pavers or a patio slab. With first frost landing around September 25 and last frost into mid May, the build window is real but not endless, so contractors here tend to stage material ahead of a weekend push rather than order piecemeal. Mason sand's uniform grain size makes it reliable for mortar mixes on retaining walls and stone veneer projects common around town. It also gives pool installers a firm, level base that will not settle unevenly once the clay underneath starts its seasonal movement.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

What is mason sand actually used for on a typical Billings project?

It is used mainly for mixing mortar, filling paver joints, and building a level base under pool liners. Its fine, uniform grain makes mortar easier to work with than coarser sands, and it packs into paver joints without leaving gaps. It is not generally recommended as bedding sand under pavers themselves.

Answer

How many cubic yards do I need for a 300 square foot patio joint fill?

At a 1 inch depth, one cubic yard covers about 324 square feet, so a 300 square foot area would need just under one full cubic yard. Most people round up to a full yard to account for settling into joints and any spillage during install.

Answer

When is the best time to install mason sand in Billings?

Spring through fall works best, roughly May through late September, since that avoids working with frozen or waterlogged material. Given the last frost around May 15 and first frost near September 25, that window lines up with when most hardscape crews here are actively building anyway.

Answer

Where will the sand be placed when it is delivered?

You choose the drop location at checkout, and our driver places the load there directly. Make sure the spot is accessible for a delivery truck and that there is enough clearance, especially if your driveway or access road is narrow.

Answer

Should I use mason sand or chip stone for paver bedding?

Many contractors now prefer clean chip stone for paver bedding because it does not pump or shift the way finer mason sand can under freeze thaw cycles. Mason sand is still the right call for joint fill and mortar mixing, so a lot of jobs end up using both materials for different layers.

More delivery around Billings, Montana

All Billings, Montana landscape supply