Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Easy to order, great service, and great product. We enjoy the final look of a very neglected beds we inherited!
I contacted Mulch Mound for #57 river rocks and it was easy and fast to get a delivery right before the holiday weekend. Stone was delivered as pro...
Read full review
I contacted Mulch Mound for #57 river rocks and it was easy and fast to get a delivery right before the holiday weekend. Stone was delivered as promised and place exactly where I asked. Excellent service! I will be ordering mulch next!
Complete Your Outdoor Project
Fill dirt is a base layer, not a finish, so most jobs cap it with a few inches of topsoil once the grade is set and compacted. If the area borders a patio or walkway, crushed stone underneath the fill can help with drainage in Cambridge's heavier clay-leaning silt loam. Mulch comes in later once whatever you plant on top of the topsoil is in the ground.
Service area
Areas we deliver fill dirt in Cambridge, Massachusetts
- Chelsea, Massachusetts
- Cochituate, Massachusetts
- Everett, Massachusetts
- Framingham, Massachusetts
- Lynn, Massachusetts
- Malden, Massachusetts
- Medford, Massachusetts
- Melrose, Massachusetts
- Newton, Massachusetts
- Peabody, Massachusetts
- Pinehurst, Massachusetts
- Revere, Massachusetts
Do not dump fill dirt in one deep pour. Cambridge's silt loam base already holds water, and a thick uncompacted layer will trap moisture underneath and settle unevenly for years, sometimes cracking a patio or slab poured on top too soon. Place it in 6 to 8 inch lifts, compact each one with a plate compactor or hand tamper before adding the next, and only cap with topsoil once the final lift is firm and stable underfoot.
The most common mistake we see on backfill jobs here is skipping compaction near foundation walls because it is slow going with a shovel and tamper in a tight space. That uncompacted fill settles after the first freeze thaw cycle each winter, pulling soil away from the foundation and creating a trench that collects water. Take the extra time to compact in thin lifts right against the wall, even if it means renting a smaller compactor.
If you are raising a large area, order fill dirt for the bulk of the depth and save topsoil for just the top few inches where roots actually need it. Topsoil costs more per yard, so using it only where something will grow keeps the project efficient without sacrificing results, especially on bigger grading jobs around Cambridge's older lots where several yards of fill get used just to level things out.
Grading and Filling in Cambridge
Cambridge sits low and flat at around 40 feet elevation, and a lot of older lots near the Charles have drainage issues where water pools against foundations or in backyards after a hard rain. The native silt loam holds moisture well, which is good for planting but bad when you need stable, buildable ground. Fill dirt gives you a structural base to raise those low areas or bring a yard up to grade before construction, additions, or a new patio. With frost reaching down through winter here, fill placed and compacted properly resists the heaving that loose or wet soil is prone to.
What Clean Fill Is
Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.
Fill Dirt vs Topsoil
Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.
Compact in Lifts
Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.