Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Highest compliments. Great driver.
Website is easy to navigate. Just a seamless process. 5 stars!!
I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).
Complete Your Outdoor Project
Most jobs using this sand also need base gravel or chip stone underneath, since sand alone will not carry structural load under a driveway or heavy patio. If you are doing mortar work, pair it with your own cement and lime rather than substituting concrete sand, which will not give you the same workability. For pool installs, a layer of coarser bedding stone below the sand cushion helps with drainage.
For mortar mixing in Chillicothe's climate, keep your sand covered and dry before use, especially heading into the fall damp season around the October frost date. Wet sand throws off your mortar ratios and weakens the mix. If you are working on brick repair on older downtown buildings, test small batches first since older mortar joints often need a softer mix than modern concrete work calls for.
A common mistake with this sand is using it as the main bedding layer under a paver patio and expecting it to stay put. Fine sand shifts and can pump up through joints during heavy rain or freeze thaw cycling, which is common here given the October to April frost window. Many installers are now using clean chip stone under pavers instead and saving this sand strictly for joint filling and mortar work.
If your project spans both a mortar job and a paver job, order this sand for the mortar portion only and source a separate coarser material for bedding, rather than trying to stretch one yard to do both jobs. Buying exactly what each phase needs keeps waste down, and this sand is dense enough that a little goes a long way in joint filling once pavers are already set.
Working With Sand in Chillicothe
Chillicothe sits on silt loam, which drains reasonably well but is not what you want under a patio or paver walkway long term. That is where this sand comes in, as a stable, well drained base layer or joint fill that does not hold water the way the native soil does. With freeze thaw cycles running from mid October through mid April here, a properly bedded and jointed hardscape project needs sand that will not pump or wash out when spring moisture returns. Masons in this area lean on this material for mortar work on both old downtown brick repair and new construction.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.