About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I contacted Mulch Mound for #57 river rocks and it was easy and fast to get a delivery right before the holiday weekend. Stone was delivered as promised and place exactly where I asked. Excellent service! I will be ordering mulch next!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most grading or backfill jobs call for 6 to 12 inches depending on how much you are raising. Measure the low area's length and width, decide your target depth, and order in cubic yards from there. For backfill around a foundation or pool wall, measure the trench volume directly rather than guessing at square footage.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Colorado Springs Fill Dirt Delivery

Colorado Springs Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I contacted Mulch Mound for #57 river rocks and it was easy and fast to get a delivery right before the holiday weekend. Stone was delivered as promised and place exactly where I asked. Excellent service! I will be ordering mulch next!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most grading or backfill jobs call for 6 to 12 inches depending on how much you are raising. Measure the low area's length and width, decide your target depth, and order in cubic yards from there. For backfill around a foundation or pool wall, measure the trench volume directly rather than guessing at square footage.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Colorado Springs Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a topsoil cap once the grade is set, since fill dirt alone will not support turf or planting. If you are backfilling near a patio or walkway, a layer of compactable base gravel underneath the fill can help with drainage on our clay-heavy ground. Either way, plan the order sizes together so you are not scheduling two separate deliveries for one project.

Mulch Mound Pro Tip

Do not dump fill dirt in one thick layer and call it done. Place it in 6 to 8 inch lifts and compact each one with a plate compactor or hand tamper before adding the next. Skip this step and the sandy clay base here will let the fill settle unevenly over the next couple winters as freeze thaw cycles work through it, leaving dips right where you thought you had solved the problem.

Mulch Mound Pro Tip

The most common mistake we see is treating fill dirt like topsoil and planting straight into it. It has no nutrient value and compacts too hard for roots to push through easily. Always cap finished grade with 4 to 6 inches of real topsoil before seeding, sodding, or planting beds, even if the fill dirt looks dark and soil-like when it arrives.

Mulch Mound Pro Tip

If your project also needs topsoil or gravel, plan both deliveries around the same grading timeline instead of spacing them out. Getting the fill compacted and graded before your topsoil truck shows up saves you from reworking the same ground twice, and it is easier to judge your topsoil quantity once the fill layer is already set to final grade.

Grading and Filling in Colorado Springs

Colorado Springs sits at 6,035 feet on sandy clay that drains fast but compacts hard once it settles, which is exactly the kind of base fill dirt is built for. A lot of homes near Garden of the Gods and through the older neighborhoods have uneven pads or low corners from decades of erosion and freeze thaw, and fill dirt is what levels that ground back out before anything else goes on top. With first frost around October 1 and last frost near May 10, there is a solid window each year to get grading done before the ground locks up. This is structural material, so plan on capping it with topsoil wherever grass, beds, or gardens are going in.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Is fill dirt the same as topsoil?

No. Fill dirt is subsoil used to raise or level ground and has little to no nutrient value, while topsoil supports plant growth. Use fill dirt for grading, backfill, and building up low areas, then cap it with topsoil wherever grass or plants are going in. They serve different jobs even though both look like dirt.

Answer

How many cubic yards of fill dirt do I need to raise a low spot in my yard?

One cubic yard covers about 54 square feet at 6 inches deep. Measure the length and width of the low area, decide how many inches you need to raise it, and scale from there. A 10 by 10 foot spot raised 6 inches needs a little under 2 cubic yards, plus extra for compaction settling.

Answer

When is the best time to bring in fill dirt in Colorado Springs?

Anytime the ground is not frozen or saturated works, generally between the last frost around May 10 and first frost near October 1 gives the widest window for grading and compacting. Working fill dirt into frozen or waterlogged sandy clay makes compaction unreliable, so aim for drier stretches during that season.

Answer

Where will the fill dirt be dropped off, and do I need to move it myself?

The truck dumps the full load at a driveway or staging area you choose at checkout, and from there you move or spread it yourself or with equipment. Make sure the drop spot has clear truck access, since a loaded delivery truck needs solid, level ground to unload safely.

Answer

Can I use fill dirt instead of topsoil for my garden bed?

Not on its own. Fill dirt is subsoil meant for structural grading and backfill, not for growing anything, since it lacks organic matter and compacts too dense for roots. If you are building a garden bed, use fill dirt only to adjust the base grade underneath, then finish with topsoil for the planting layer.

More delivery around Colorado Springs, Colorado

All Colorado Springs, Colorado landscape supply