About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, which is the minimum lift for compaction. For deeper fills, figure your square footage times depth in feet, divided by 27, to get cubic yards, then plan on placing it in 6 to 8 inch lifts rather than one deep pour. Most backfill and low spot jobs in the Columbus area run somewhere between 3 and 15 cubic yards depending on how much grade you're correcting.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Columbus Fill Dirt Delivery

Columbus Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, which is the minimum lift for compaction. For deeper fills, figure your square footage times depth in feet, divided by 27, to get cubic yards, then plan on placing it in 6 to 8 inch lifts rather than one deep pour. Most backfill and low spot jobs in the Columbus area run somewhere between 3 and 15 cubic yards depending on how much grade you're correcting.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Columbus Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a cap of topsoil once the grade is set and compacted, especially anywhere grass or landscaping goes back in. If you're backfilling around a foundation or pool wall, a layer of gravel at the base can help with drainage before the fill goes in. Mulch or compost comes later, once topsoil is down and planting starts.

Mulch Mound Pro Tip

Never dump fill dirt in one deep pour. Place it in 6 to 8 inch lifts and compact each layer before adding the next, especially in Columbus's silt loam, which holds water and settles unevenly if it's not compacted properly. Skipping this step is the number one reason people end up with a sunken patch by a foundation or patio a year later, right when they thought the job was done.

Mulch Mound Pro Tip

Fill dirt is not soil for planting. It's subsoil, stripped of organic matter and screened of debris, so nothing will thrive growing directly in it. Always cap finished fill with 4 to 6 inches of real topsoil before seeding or laying sod. Skipping the cap is a common mistake that leads to patchy grass and plants that struggle no matter how much water or fertilizer you throw at them.

Mulch Mound Pro Tip

Order slightly more than your calculated volume, since compaction typically reduces loose fill by 10 to 15 percent once it settles. It's cheaper to have a little extra on site than to schedule a second delivery for a small top off. If you're also ordering topsoil for the cap layer, coordinate both deliveries around the same time so your crew isn't waiting on material mid job.

Grading and Filling in Columbus

Columbus sits on silt loam that compacts slowly and holds moisture longer than sandy soil, which is part of why low areas near foundations and pool decks tend to stay soft or puddle after storms. Fill dirt gives you a structural base to correct that grade before anything else goes on top. With frost typically arriving by October 10 and the ground staying workable well into fall, most fill dirt jobs here happen from spring thaw through early autumn. It is not a growing medium, so plan to cap it with topsoil wherever grass or plants need to take root.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my backyard in Columbus?

Yes, that's one of the most common uses. Since Columbus yards often sit on silt loam that holds water in low spots, fill dirt raises and levels the grade before anything else goes down. Place it in compacted lifts of 6 to 8 inches, and cap the finished surface with topsoil if you want grass or plants to grow there.

Answer

How many cubic yards of fill dirt do I need for a small low spot?

For a 200 square foot area at 6 inches deep, you'd need roughly 3.7 cubic yards, since one cubic yard covers about 54 square feet at that depth. For deeper fills, multiply your square footage by the depth in feet and divide by 27. Round up slightly to account for compaction settling.

Answer

When is the best time to have fill dirt delivered and installed in Columbus?

Fill dirt work isn't really seasonal, it's driven by the project, but most people schedule it between the last frost around May 1 and before the ground firms up near the October 10 first frost. That window gives you workable soil and enough time to compact and cap before winter if grass or planting is next on the list.

Answer

Do you deliver fill dirt straight into my backyard?

Delivery placement depends on truck access. If there's a clear driveway or side yard path wide enough for the truck, we can often get close to the work area. Otherwise the load gets placed at the closest accessible point and you'll need to move it the rest of the way. Delivery timing is scheduled at checkout.

Answer

Should I use fill dirt or topsoil for my project?

It depends on the goal. Fill dirt is a structural subsoil for raising grade, backfilling foundations, or building up before planting, it's not meant to grow anything in directly. Topsoil is the growing layer that goes on top once your grade is set. Most grading jobs in Columbus use both, fill dirt underneath and topsoil capping the last few inches.

More delivery around Columbus, Ohio

All Columbus, Ohio landscape supply