About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 10 by 10 foot low spot needs roughly two yards if you're filling to that depth. For deeper work, like backfilling around a foundation wall or bringing a yard up before a pool install, figure your cubic footage and divide by 27 to get yards, then add a bit for compaction settling.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Des Moines Fill Dirt Delivery

Des Moines Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 10 by 10 foot low spot needs roughly two yards if you're filling to that depth. For deeper work, like backfilling around a foundation wall or bringing a yard up before a pool install, figure your cubic footage and divide by 27 to get yards, then add a bit for compaction settling.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Des Moines Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a few inches of topsoil capped on top wherever grass or plants need to grow, since fill dirt itself has nothing living in it. Some contractors also bring in a compactible base material below patios or sheds for extra stability before the fill goes in. If the finished area is going to be lawn, plan for topsoil and maybe some compost worked into the top layer.

Mulch Mound Pro Tip

Place fill dirt in lifts of 6 to 8 inches and compact each lift before adding the next, especially given how Des Moines clay loam already shifts with moisture. Skipping this and dumping a deep pile at once looks fine for a season, then sinks unevenly as the lower material settles under its own weight. A hand tamper works for small spots, a plate compactor is worth renting for anything larger than a flower bed sized area.

Mulch Mound Pro Tip

The most common mistake with fill dirt is treating it like topsoil and planting straight into it. It has no organic content and compacts hard, so roots struggle and water sits oddly. Always cap finished fill with 4 to 6 inches of real topsoil before seeding or planting anything, and keep that distinction in mind when you're ordering, you likely need both materials, not just one.

Mulch Mound Pro Tip

If you're filling a large low area, order fill dirt for the bulk of the depth and save topsoil for just the top layer, this is cheaper than filling the whole depth with topsoil and it performs better structurally anyway. Pair the order with a compactor rental for the day so the lifts go in right the first time instead of needing a follow up delivery next spring.

Grading and Filling in Des Moines

Des Moines sits on silty clay loam that already drains slowly, so low areas in a yard tend to hold water long after a spring rain. Fill dirt is what people here reach for to raise those wet spots or level ground before pouring a patio slab or setting a pool. Because the native soil compacts unevenly once disturbed, whatever fill goes in has to be placed and compacted in stages, not dumped and left. This is structural material for reshaping grade, not something to plant into directly.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Des Moines?

Yes, that's one of the most common uses, especially where the clay loam holds water in low corners. Just plan to compact it in lifts rather than dumping it all at once, and cap the finished grade with topsoil if you want grass to grow on top. Uncapped fill will grow weeds unevenly and erode in heavy rain.

Answer

How many cubic yards of fill dirt do I need for a 200 square foot low spot?

At a 6 inch fill depth, one yard covers about 54 square feet, so 200 square feet needs roughly 3.7 cubic yards, call it 4 to account for compaction. If you're filling deeper, say 12 inches, double that to around 7 to 8 yards.

Answer

When is the best time to bring in fill dirt before winter?

Aim to finish grading and compacting before the ground starts freezing, which in Des Moines is typically after the October 10 first frost. Working the soil while it's still workable makes compaction far more effective than trying to place fill dirt into partially frozen ground.

Answer

Where will the delivery truck place the fill dirt on my property?

The driver places it as close to your marked drop zone as the truck can safely access, usually the driveway or curb if the yard itself isn't reachable. Clear obstacles like parked cars or low branches ahead of time, and let us know at checkout if access is tight so we can plan the drop accordingly.

Answer

Should I order fill dirt or topsoil for my project?

Fill dirt is for raising grade and structural backfill, it has no nutrients and compacts hard, which is exactly what you want under a patio or around a foundation. Topsoil goes on top where anything needs to grow. Most grading projects in Des Moines use fill dirt for the bulk of the depth and a topsoil cap on the last few inches.

More delivery around Des Moines, Iowa

All Des Moines, Iowa landscape supply