About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

We have always spread our own mulch for the past 24 years. This was our first time with the Mulch Mound - things I liked: they have online ordering and provide a digital receipt which means you can remember how much you ordered (I always forget for the next year!), they were o...

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar or joint work only needs 1 to 2 inches installed. For a small patio joint fill job you may only need a fraction of a yard, but for a pool base or a larger paver project figure your square footage first, then divide by 324 to get yards needed at that depth.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Fayetteville Sand Delivery

Fayetteville Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

We have always spread our own mulch for the past 24 years. This was our first time with the Mulch Mound - things I liked: they have online ordering and provide a digital receipt which means you can remember how much you ordered (I always forget for the next year!), they were o...

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar or joint work only needs 1 to 2 inches installed. For a small patio joint fill job you may only need a fraction of a yard, but for a pool base or a larger paver project figure your square footage first, then divide by 324 to get yards needed at that depth.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Fayetteville Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most mason sand orders in Fayetteville show up alongside pavers or natural stone for patios, and sometimes with portland cement for anyone mixing their own mortar on site. If you are doing a pool install, gravel or crushed stone often goes down first as a sub base before the sand layer. Chip stone has become a common substitute for paver bedding since it will not pump under pressure the way sand can over time.

Mulch Mound Pro Tip

Mason sand is finer and more uniform than concrete sand, which is exactly why it works for mortar, concrete sand has too much grit variation and makes the mix harder to trowel smooth. If you are mixing mortar by hand or with a small mixer, screen out any debris first, Fayetteville's sandy loam soil can blow fine dust onto a stored pile and you do not want that in your mix.

Mulch Mound Pro Tip

A common mistake with paver joints is packing sand in wet. Wait for a dry stretch, work it in with a plate compactor or hand tamper in thin passes, and sweep excess off the surface before a rain event. Fayetteville gets humid summer afternoons, so mid morning after dew has burned off is a better working window than early morning.

Mulch Mound Pro Tip

If your project is a paver patio rather than mortar work, ask whether chip stone makes more sense for the bedding layer. It has been replacing sand for that use because it locks together and will not pump up through joints under freeze thaw cycles or heavy foot traffic, sand still wins for mortar and pool bases where fine uniform grain matters more than lock up.

Working With Sand in Fayetteville

Fayetteville sits on sandy loam already, so your native soil drains fast and does not fight you the way clay does further inland. That is good news for pool base prep and paver joint work, less good news if you are trying to hold moisture. Most orders here are tied to hardscape jobs, patios near the Airborne and Special Operations Museum area, mortar mixing for brick work, and pool installs that need a clean stable base. This sand is not a soil amendment, it is a construction material, so plan the order around the actual project footprint.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as regular sandbox or play sand?

No, this is washed and screened mason sand meant for construction, mortar mixing, paver joints, and pool bases. It is finer and cleaner than bagged play sand and sold in bulk by the cubic yard, which is more practical for anything beyond a small backyard box.

Answer

How many cubic yards do I need for a small paver patio?

One cubic yard covers about 324 square feet at a 1 inch depth, and paver joint work usually only needs 1 to 2 inches. Measure your patio square footage, divide by 324, and round up slightly since mortar and joint work always uses a bit more than the math suggests.

Answer

When is the best time to install a paver patio in Fayetteville?

Spring through fall is peak hardscape season here since the ground is workable and rain patterns are more predictable than winter. Aim to install joints on a dry day, humid summer afternoons make sand harder to pack evenly, so mid morning after the dew clears works better.

Answer

Where will the sand be dropped and do I need to be home?

The driver places the load where you direct at checkout, typically a driveway or curb space near your work area. You do not need to be home, but clear the drop zone ahead of time and make sure the access path can handle a delivery truck.

Answer

Should I use mason sand or chip stone under my pavers?

Mason sand still works for paver bedding but chip stone has become more common because it locks together and resists pumping under freeze thaw or heavy foot traffic. For mortar mixing or pool bases, mason sand is still the right choice since it needs that fine uniform grain.

More delivery around Fayetteville, North Carolina

All Fayetteville, North Carolina landscape supply