About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how much grade you need to make up. Measure the low area's length and width, decide how many inches you need to raise it, and that gives you the yardage. For anything deeper than 8 inches, plan on multiple compacted lifts rather than one thick dump.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Flint Fill Dirt Delivery

Flint Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how much grade you need to make up. Measure the low area's length and width, decide how many inches you need to raise it, and that gives you the yardage. For anything deeper than 8 inches, plan on multiple compacted lifts rather than one thick dump.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Flint Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a layer of topsoil on top wherever grass, beds, or anything else needs to root, since fill dirt itself won't support plant growth. If you're backfilling around a foundation or old pool, a base layer of crushed stone underneath the fill can help with drainage before you build up. Mulch or topsoil orders are easy to add once the grading work is done.

Map of the fill dirt delivery area around Flint, Michigan

Service area

Areas we deliver fill dirt in Flint, Michigan

Mulch Mound Pro Tip

Flint's sandy clay doesn't drain fast, so if you're filling a low spot that collects water, don't just dump fill dirt on top of standing moisture. Let the area dry out or dig a shallow drainage channel first, then place your fill in lifts. Compacting wet clay-heavy fill traps water underneath it, and that spot will keep sinking for a season or two instead of settling once.

Mulch Mound Pro Tip

The most common mistake with fill dirt is treating it like topsoil and expecting grass to grow in it. It's subsoil, screened of debris but not amended, so cap any area that needs planting with 4 to 6 inches of real topsoil. Skipping this step means thin, patchy grass no matter how much seed or fertilizer goes down afterward.

Mulch Mound Pro Tip

If your project is a mix of raising grade and finishing with lawn or beds, order fill dirt and topsoil as separate deliveries rather than trying to blend them yourself. It's usually more efficient to get the exact yardage of each you need than to over order one to stretch coverage, especially with Flint's clay content already limiting drainage in the fill layer.

Grading and Filling in Flint

Flint's sandy clay base drains slowly and shifts more than sandier soils once it gets saturated, which is why low areas near foundations and old outbuildings tend to hold water into spring. Fill dirt gives you a stable base to raise that grade before anything else goes on top. With a last frost around May 5, most fill and grading work here happens from mid spring through fall before the ground firms up for winter. This is not a growing medium, so plan on capping with topsoil if grass or beds are going in above it.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

What exactly is fill dirt made of, and is it clean?

Our fill dirt is subsoil from local excavation projects, screened to remove roots, rocks, and construction debris. It's not topsoil and won't have the organic content to grow plants well, but it's clean structural material suited for raising grade, backfilling, and building up low areas before finishing layers go on top.

Answer

How many cubic yards do I need to fill a 200 square foot low spot?

At a 6 inch depth, one cubic yard covers about 54 square feet, so 200 square feet needs roughly 3.7 cubic yards, call it 4. If you're going deeper, say 12 inches, double that to around 7.5 yards. Round up since compaction will settle the material down after placement.

Answer

Do I need to compact fill dirt myself, and when's the best time to do it?

Yes, fill dirt should go down in 6 to 8 inch lifts, compacted between each layer, or it keeps settling unevenly for years. Spring through fall works best in Flint since the ground is workable and you're not fighting frozen or saturated clay. Renting a plate compactor for a weekend is usually enough for residential jobs.

Answer

Where will the truck place the fill dirt on delivery day?

The driver drops the load as close to your work area as truck access allows, typically in a driveway or along a curb if the yard itself isn't accessible. Fill dirt is heavy, so having a clear path at least as wide as a standard truck matters. You'll move it from the drop point to the exact spot in wheelbarrow loads.

Answer

Should I get fill dirt or topsoil for my project?

Use fill dirt for volume, raising grade, backfilling foundations, or filling in a removed pool or stump, anywhere structure matters more than growing. Use topsoil as the finish layer on top, usually 4 to 6 inches, wherever grass or plants need to establish. Most grading projects here in Flint use both, fill below and topsoil on top.

More delivery around Flint, Michigan

All Flint, Michigan landscape supply