About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I contacted Mulch Mound for #57 river rocks and it was easy and fast to get a delivery right before the holiday weekend. Stone was delivered as promised and place exactly where I asked. Excellent service! I will be ordering mulch next!

One cubic yard covers about 54 square feet at a 6 inch depth, and most fill jobs run 6 to 12 inches depending on how much grade you're correcting. Measure the low area in square feet, decide your target depth, and figure your yardage from there, then add a bit extra since compaction will settle the material down. If you're capping with topsoil afterward, size that separately since it's a different material with different coverage.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Greenville Fill Dirt Delivery

Greenville Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I contacted Mulch Mound for #57 river rocks and it was easy and fast to get a delivery right before the holiday weekend. Stone was delivered as promised and place exactly where I asked. Excellent service! I will be ordering mulch next!

One cubic yard covers about 54 square feet at a 6 inch depth, and most fill jobs run 6 to 12 inches depending on how much grade you're correcting. Measure the low area in square feet, decide your target depth, and figure your yardage from there, then add a bit extra since compaction will settle the material down. If you're capping with topsoil afterward, size that separately since it's a different material with different coverage.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Greenville Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs in Greenville get capped with a few inches of topsoil once the grade is set, especially if grass or beds are going back in. If you're building up a large low area, some customers layer in a coarser base material first for drainage before the fill goes on top. Either way, plan your topsoil or planting material as a separate order once your fill is compacted and settled.

Mulch Mound Pro Tip

Greenville's clay subsoil means water doesn't move through the ground quickly, so if you're filling near a foundation or pool, slope the final grade away from the structure before you cap with topsoil. A flat or low spot in fill dirt over clay will hold water after every storm. Take the extra hour to check your grade with a level before you consider the job done, it saves a callback later.

Mulch Mound Pro Tip

The most common mistake we see is dumping fill dirt in one deep pour instead of building it up in lifts. Fill dirt that isn't compacted in 6 to 8 inch layers will keep settling for a year or more, leaving dips right where you thought you'd leveled the ground. Compact each lift with a plate compactor or even repeated passes with a hand tamper before adding the next layer, it's slower but it's the only way the fill actually holds its grade.

Mulch Mound Pro Tip

Fill dirt is a structural material, not something to grow in, so don't waste money buying extra to use as a planting bed. Order just enough fill to reach your target grade, then cap the top few inches with topsoil where grass or plants are going in. Buying fill and topsoil separately, sized for their actual jobs, is more efficient than over-ordering one material to do both.

Grading and Filling in Greenville

Greenville's clay soil holds water and settles unevenly, which is why so many yards near the Reedy River and older neighborhoods develop low spots and soggy corners over time. Fill dirt gives you a structural base to correct that grade before anything else happens, whether it's leveling ground for a patio or backfilling after pool installation. Because the native soil is already clay heavy, we screen our fill dirt of debris and roots so you're not compacting problems into the ground for years. This is subsoil, not topsoil, so it's meant to build elevation, not grow anything.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my backyard in Greenville's clay soil?

Yes, fill dirt is exactly what's used to correct low or uneven grade, and it's a common fix here since Greenville's clay base already drains slowly and tends to hold water in low spots. Build it up in 6 to 8 inch compacted lifts rather than one deep pour, and cap with topsoil if you're planting grass or beds on top.

Answer

How many cubic yards of fill dirt do I need for a small low spot?

One cubic yard covers about 54 square feet at 6 inches deep. For a 200 square foot low spot at that depth, you'd need roughly 4 cubic yards, a bit more if you're going deeper or want extra for compaction settling. Measure the area and depth first, then order accordingly.

Answer

When is the best time to bring in fill dirt in Greenville?

Fill dirt is a project driven material, not a seasonal one, so timing depends on your job rather than the calendar. That said, working outside the wettest stretches makes compaction easier, since Greenville's clay soil gets heavy and hard to work when saturated. Drier weather between frost dates generally makes for cleaner, easier compaction.

Answer

Where will the fill dirt be dropped on delivery day?

The load is placed at the access point you specify, usually a driveway or curbside spot close to your project area. Make sure the path is clear of vehicles or obstacles, and have a plan for moving it to the exact spot since our delivery drops the full load rather than spreading it.

Answer

Should I get fill dirt or topsoil for my project?

Use fill dirt to raise grade or backfill, it's subsoil meant for structure, not growing. Topsoil goes on top once your grade is set, in the last few inches, wherever grass or plants need to establish. Most grading jobs use both, fill for elevation and topsoil as the cap layer.