About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of mason sand covers about 324 square feet at a 1 inch depth, and most jobs here call for 1 to 2 inches depending on whether you are bedding pavers or mixing mortar batches. For a typical patio or walkway base, figure your square footage first, then decide if you need the full 2 inches for stability under heavier pavers. Since it is sold by the cubic yard, round up rather than ordering short and having to schedule a second delivery mid project.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Greenville Sand Delivery

Greenville Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of mason sand covers about 324 square feet at a 1 inch depth, and most jobs here call for 1 to 2 inches depending on whether you are bedding pavers or mixing mortar batches. For a typical patio or walkway base, figure your square footage first, then decide if you need the full 2 inches for stability under heavier pavers. Since it is sold by the cubic yard, round up rather than ordering short and having to schedule a second delivery mid project.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Greenville Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most paver jobs pair mason sand with a base layer of crushed stone underneath for drainage through Greenville's clay, plus paver joint sand to lock the top course in place once it is set. If your project is a pool base, a layer of gravel below the sand helps keep the whole system stable over time. Some crews are now using clean chip stone instead of sand for paver bedding since it will not pump or wash out, worth asking about if drainage is a concern on your site.

Mulch Mound Pro Tip

Mason sand's fine, uniform grain is what makes it workable in mortar, but that same fineness means it compacts differently than concrete sand under a paver base. If you're screeding for pavers, wet the sand slightly before leveling, it holds its shape better under a screed board than bone dry sand, which shifts and creates low spots once you start setting stone on top.

Mulch Mound Pro Tip

A common mistake on clay soil sites like much of Greenville is skipping a compacted base layer and going straight to sand. Clay shifts with moisture, and sand alone won't stop that movement from telegraphing up through your pavers. Always compact a gravel base first, then screed your sand layer on top, thin and level, before setting pavers or building a pool deck foundation.

Mulch Mound Pro Tip

Mason sand is increasingly being swapped out for clean chip stone as paver bedding material because chip stone does not pump moisture up through joints the way sand can after heavy rain. If your project sits somewhere with poor drainage or your soil holds water like the clay common here, ask about chip stone as an alternative before you commit to a full sand order.

Working With Sand in Greenville

Greenville sits on heavy clay, and that clay does not drain the way sand does, which matters when you are setting pavers or laying a pool base near the river walk or anywhere close to the Liberty Bridge area. Mason sand gives you a clean, stable bedding layer that will not hold water against a paver system the way native clay would. With hardscape season running spring through fall here, most orders come in ahead of patio and walkway builds before the summer humidity peaks. It is also the standard choice for mortar mixing on brick and stone work common in Upstate neighborhoods.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is mason sand the same as regular sand from a hardware store?

Not quite. Mason sand is washed and finely screened to a consistent grain size, which is what makes it work well in mortar mixes and under pavers. Hardware store bagged sand is often coarser or less consistent, and buying by the cubic yard through bulk delivery gets you a uniform product at real project volume instead of bag after bag.

Answer

How many cubic yards do I need for a paver patio?

One cubic yard covers about 324 square feet at a 1 inch depth, so measure your patio's square footage and divide by 324 to start. Most paver beds want 1 to 2 inches, so if you're going with 2 inches, you'll need roughly double that amount. Round up slightly since screeding always uses a bit more than the math suggests.

Answer

When is the best time to install a sand base for pavers in Greenville?

Spring through fall is when most hardscape projects happen here, avoiding the wettest stretches around first frost in November and last frost in April. Working the clay soil under drier conditions makes compaction and grading much easier, and the sand layer sets up cleaner without excess moisture working against you.

Answer

Where will the sand be placed when it's delivered?

We place the load wherever is accessible for our delivery truck, typically a driveway or a flat area near your project site. Let us know ahead of time if access is tight, since a full truck needs a reasonably wide, clear path to dump the load safely without damaging your property.

Answer

Should I use mason sand or chip stone for my paver base?

Mason sand is the traditional choice and still works well, especially for mortar mixing, but chip stone is increasingly preferred for paver bedding because it does not pump or wash out under moisture the way sand can. If your site has drainage concerns or sits on heavier clay, chip stone may hold up better long term.

More delivery around Greenville, South Carolina

All Greenville, South Carolina landscape supply