Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

At a 1 inch depth, one cubic yard covers about 324 square feet, so a small paver patio or mortar prep area might only need a partial yard while a pool base or larger mason job can run several yards. Depth for this sand typically runs 1 to 2 inches depending on whether it is bedding, joint fill, or a mortar mix component, so cut the coverage roughly in half if you are going 2 inches. Measure your square footage first, then match it to the depth your project actually calls for.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Hartford Sand Delivery

Hartford Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

At a 1 inch depth, one cubic yard covers about 324 square feet, so a small paver patio or mortar prep area might only need a partial yard while a pool base or larger mason job can run several yards. Depth for this sand typically runs 1 to 2 inches depending on whether it is bedding, joint fill, or a mortar mix component, so cut the coverage roughly in half if you are going 2 inches. Measure your square footage first, then match it to the depth your project actually calls for.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Hartford Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Sand pairs naturally with paver stone or patio block for joint work, and with poured concrete footings where a leveling layer is needed before the pour. Some Hartford contractors are shifting paver bedding to chip stone instead of sand since chip stone does not pump out from under pavers over freeze thaw cycles, worth asking about if joint stability has been an issue on past jobs.

Mulch Mound Pro Tip

Mason sand absorbs moisture fast, and Hartford's spring thaw period between late March and April 25 can leave a pile sitting on wet ground longer than expected. Stage your delivery on a pallet, plywood, or gravel pad rather than bare soil so the pile does not wick up water from underneath, which changes your mortar mix ratios without you noticing until the mortar starts cracking.

Mulch Mound Pro Tip

A common mistake is using this sand as paver bedding the way it was used a decade ago. It is finer than concrete sand, and over a Hartford winter freeze thaw cycle that fine grain can migrate and pump out from under the pavers, leaving low spots by the second season. If bedding is the goal, ask about chip stone instead and save this sand for mortar and joint work where its fineness is the advantage, not the liability.

Mulch Mound Pro Tip

Order slightly more than your calculated volume if the project involves mortar mixing, since batch waste and spillage during mixing runs higher than with straight bedding work. It is also worth combining a sand order with a stone dust or paver base delivery if you are doing a full patio, since staging both materials on the same delivery day saves a second trip and a second cleared spot on the driveway.

Working With Sand in Hartford

Hartford sits on silty loam that drains slower than sandy soils to the south, so a lot of local hardscape work leans on imported sand for the parts of a project the native soil cannot handle, like pool bases and paver joint fill. With a first frost around October 15 and last frost around April 25, the building window for mortar work runs roughly six months, so contractors near the Capitol area tend to stage material in spring and fall pushes. This mason sand holds up in mortar mixes and joint work even when the surrounding clay-heavy loam does not drain well underneath. It is not a substitute for the soil work, it is the finish material for the parts that need consistency.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand or paver sand?

Yes, this is what is sold regionally as mason sand, washed and finely screened for mortar mixing, paver joint fill, and pool base work. It is finer and more uniform than concrete sand, which is what makes mortar workable and joints fill evenly without gaps.

Answer

How many cubic yards do I need for a paver patio?

One cubic yard covers about 324 square feet at a 1 inch depth, so a 300 square foot patio jointing job likely needs close to one yard, less if you are only filling joints rather than a full bed. For a 2 inch bed depth, expect coverage closer to 160 square feet per yard, so measure your area and depth first.

Answer

When is the best time to install with sand in Hartford?

Hardscape season here runs spring through fall, roughly matching the frost free window between late April and mid October. Working outside that window means cold, damp material that is harder to compact and mortar that cures poorly, so most local contractors stage sand orders for the warmer half of the year.

Answer

Where does the delivery truck place the sand?

The load is placed wherever you specify, typically a driveway or a cleared staging area with truck access. Delivery date is scheduled at checkout, so plan to have the spot cleared and accessible by then, especially if the truck needs to back in on a narrower Hartford street.

Answer

Should I use this sand or chip stone under my pavers?

For paver bedding specifically, chip stone is increasingly preferred locally because it resists pumping out from under pavers during freeze thaw cycles, unlike fine sand. This mason sand is still the right choice for mortar mixing, joint fill, and pool base work where its fine, uniform grain is an advantage rather than a drawback.