About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I couldn't be happier with the speed and quality of the mulch delivery service of Mulch Mound. Every detail from ordering, to communication with on time delivery, to perfect product placement was amazing. I needed more and I got it within 2 hours! I'm never doing this with ba...

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most fill jobs in Jacksonville run 6 to 12 inches to bring a low area up to grade, so a 200 square foot low spot at 6 inches needs roughly 4 cubic yards, and double that if you're going 12 inches. Measure the low area in square feet first, then match it to your target depth before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Jacksonville Fill Dirt Delivery

Jacksonville Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I couldn't be happier with the speed and quality of the mulch delivery service of Mulch Mound. Every detail from ordering, to communication with on time delivery, to perfect product placement was amazing. I needed more and I got it within 2 hours! I'm never doing this with ba...

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most fill jobs in Jacksonville run 6 to 12 inches to bring a low area up to grade, so a 200 square foot low spot at 6 inches needs roughly 4 cubic yards, and double that if you're going 12 inches. Measure the low area in square feet first, then match it to your target depth before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Jacksonville Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a cap of topsoil once the grade is where you want it, since fill dirt itself isn't meant to grow anything. If the finished area will see grass or planting beds, order topsoil for the top few inches after the fill is compacted. Some jobs also pair fill with gravel for drainage layers under patios or sheds.

Map of the fill dirt delivery area around Jacksonville, North Carolina

Service area

Areas we deliver fill dirt in Jacksonville, North Carolina

Mulch Mound Pro Tip

Jacksonville's sandy native soil doesn't compact the same way clay-heavy fill does, so don't assume your existing ground will hold a new fill layer without prep. Scarify or loosen the top few inches of native soil before placing fill, this gives the new material something to key into instead of sitting as a separate layer that shears apart later. Skipping this step is one of the more common reasons fill jobs settle unevenly within the first year.

Mulch Mound Pro Tip

The biggest mistake on fill jobs is dumping the full depth in one pass. Place fill in 6 to 8 inch lifts and compact each one with a plate compactor or hand tamper before adding the next. Skip this and the ground keeps settling for years, showing up as dips near foundations or pool decks well after the job looked finished.

Mulch Mound Pro Tip

Fill dirt is a structural material, not a growing medium, so don't waste money capping the whole depth with topsoil. Bring fill up to within 3 to 4 inches of final grade, compact it fully, then finish with a thinner topsoil layer only where grass or plants need to root. This keeps the higher cost material where it actually does something.

Grading and Filling in Jacksonville

At 25 feet of elevation and with sandy soil underneath, Jacksonville doesn't drain the way you'd hope, and low spots near driveways, sheds, and pool decks tend to hold water after a storm rolls through off the coast. Fill dirt is how you fix that, not by amending the soil but by physically raising the grade with compactable material. Because the native soil is sandy, it doesn't offer much structure on its own, so bringing in a denser subsoil for backfill around foundations gives you something that will actually hold shape once compacted. This is a structural fix, not a planting one.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I plant grass directly in fill dirt in Jacksonville?

Not directly. Fill dirt is subsoil meant for raising grade and backfilling, it doesn't have the organic content grass needs to establish. Cap the compacted fill with a few inches of topsoil before seeding or laying sod, especially given how sandy and low in nutrients the native ground here already is.

Answer

How many cubic yards do I need to fill a low spot by my pool?

Measure the square footage of the low area and multiply by your target depth. One cubic yard covers about 54 square feet at 6 inches, so a 300 square foot area at 6 inches needs roughly 5.5 cubic yards, and closer to 11 yards if you're going a full 12 inches.

Answer

When is the best time to bring in fill dirt around here?

Fill dirt is project driven rather than seasonal, so it's less about the calendar and more about dry ground. Jacksonville's sandy soil drains fairly fast after rain, but working when the site isn't saturated makes compaction easier and more effective, so aim for a stretch of dry days rather than a specific month.

Answer

Where will the truck place the load and what do I need to clear beforehand?

You specify the drop location at checkout, whether that's a driveway, curb, or a spot on the worksite itself. Clear a path wide enough for the delivery vehicle and make sure there's nothing blocking access, since the load gets placed where you direct rather than moved around after drop off.

Answer

What's the difference between fill dirt and topsoil for my project?

Fill dirt is screened subsoil used to raise grade and backfill, it's built for structure and compaction, not for growing anything. Topsoil has the organic content plants need but doesn't compact the same way, so it's used as a thin cap on top of fill, not as the bulk material for raising a low area.

More delivery around Jacksonville, North Carolina

All Jacksonville, North Carolina landscape supply