About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard of sand covers about 324 square feet at a 1 inch depth, which is the standard for mortar mixing and paver joint filling. If you are setting a paver base at closer to 2 inches, plan on roughly half that coverage per yard, so figure your square footage first and work backward from there. Most Keene patio and walkway jobs land somewhere between 1 and 3 cubic yards.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Keene Sand Delivery

Keene Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard of sand covers about 324 square feet at a 1 inch depth, which is the standard for mortar mixing and paver joint filling. If you are setting a paver base at closer to 2 inches, plan on roughly half that coverage per yard, so figure your square footage first and work backward from there. Most Keene patio and walkway jobs land somewhere between 1 and 3 cubic yards.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Keene Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Sand pairs naturally with paver base gravel underneath it and polymeric jointing sand on top, and most hardscape jobs around Keene need all three delivered together. If you are doing mortar work, you will also want portland cement on hand before the sand arrives. For pool bases, a layer of crushed stone underneath helps with drainage given the clay content in the local till.

Mulch Mound Pro Tip

Mason sand and paver bedding sand are not interchangeable, even though people mix them up constantly. Mason sand is finer and more uniform, which is what makes mortar workable under a trowel, but that same fineness lets it wash out or pump up through paver joints over time. If you are setting pavers, ask about clean chip stone instead, which locks together and will not migrate the way sand does under freeze thaw cycling.

Mulch Mound Pro Tip

In Keene, timing your sand delivery matters more than people expect. Mortar work needs dry curing conditions, and with first frost typically landing October 3, late season mortar jobs risk not curing properly before temperatures drop. Plan mortar and hardscape sand projects to wrap up by mid September if you want a full margin of safety before the weather turns.

Mulch Mound Pro Tip

If you are doing both a paver base and mortar work on the same job, it is worth ordering enough sand for both in one delivery rather than two separate trips, since sand from the same batch keeps a consistent grade throughout your project. Keep any leftover material covered and dry over winter, since Keene's snow load and freeze thaw cycle will clump wet sand into a solid, unworkable mass by spring.

Working With Sand in Keene

Keene sits on glacial till, which is a rocky, unpredictable base that does not drain or compact the way sand does. That is exactly why sand still earns a place on hardscape jobs here, as a leveling layer under pavers or as a clean ingredient in mortar for stone and brick work common on the older homes around town. With zone 5b winters and a freeze thaw cycle that runs hard from November through March, a well screened sand base matters more here than in milder climates, since a poorly set base heaves and shifts pavers by spring.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same sand used for mortar and for paver bases in Keene?

It is the mason sand type, finer and more uniform, which makes it ideal for mortar mixing and paver joint filling. For paver bedding specifically, many contractors are moving toward clean chip stone instead, since it locks in place and will not pump or wash out the way sand can under freeze thaw movement.

Answer

How many cubic yards do I need for a patio paver joint job?

One cubic yard covers about 324 square feet at a 1 inch depth, which is typical for joint filling. For a standard 200 to 300 square foot patio, one cubic yard is usually enough, but measure your actual joint area and depth before ordering since usage varies by paver size and spacing.

Answer

When is the best time to order sand for mortar work in Keene?

Spring through fall works best, ideally wrapping up mortar projects by mid September. With first frost typically hitting around October 3, mortar needs time to cure properly before freezing temperatures arrive, and cold, wet conditions common to Keene's late fall can compromise a fresh mix.

Answer

Where will the sand be placed when it is delivered?

The load gets placed on a hard, accessible surface like a driveway, at the location you specify during checkout. Clear a spot roughly the size of a parking space beforehand, and keep in mind Keene's older neighborhoods sometimes have narrow driveways, so measure your access point ahead of time.

Answer

Should I use sand or gravel under my pavers given Keene's soil?

With glacial till as the predominant soil here, drainage matters more than usual. Many contractors now prefer chip stone over sand for paver bedding specifically because it will not pump or shift with freeze thaw cycling. Sand still works well for mortar mixing and pool base applications where its fine, uniform texture is the actual advantage.

More delivery around Keene, New Hampshire

All Keene, New Hampshire landscape supply