About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

At a 1 inch depth, one cubic yard of sand covers about 324 square feet, so a typical paver patio or mortar prep job runs somewhere between half a yard and two yards depending on footprint. Since this sand is usually installed at 1 to 2 inches, halve that coverage number if you are going for the deeper end. Measure your paver area or mixing needs first, then order by the cubic yard rather than guessing.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Lincoln Sand Delivery

Lincoln Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

At a 1 inch depth, one cubic yard of sand covers about 324 square feet, so a typical paver patio or mortar prep job runs somewhere between half a yard and two yards depending on footprint. Since this sand is usually installed at 1 to 2 inches, halve that coverage number if you are going for the deeper end. Measure your paver area or mixing needs first, then order by the cubic yard rather than guessing.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Lincoln Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Sand pairs naturally with paver base gravel underneath and paver joint work on top, and a lot of Lincoln hardscape jobs also call for a small amount of chip stone since it is increasingly used in place of sand for paver bedding because it does not pump out from under the pavers. If you are mixing mortar, keep some extra cement and lime on hand so you are not waiting mid batch.

Mulch Mound Pro Tip

For mortar mixing in Lincoln's climate, keep your sand dry and covered before use, especially heading into fall when afternoon showers are common ahead of the October frost. Wet sand throws off your water to cement ratio and makes mortar inconsistent from batch to batch. If you are working through a multi day masonry job, tarp the pile each night rather than trusting it to drain or dry on its own between pours.

Mulch Mound Pro Tip

A common mistake on paver jobs here is using this sand as the final bedding layer under pavers instead of just for joint filling. Bedding sand needs to stay put under compaction and traffic, and on Lincoln's silty clay loam, joint sand can migrate into the base over a wet season. Many local installers now use clean chip stone under the pavers instead, since it locks in place and will not pump out the way sand can.

Mulch Mound Pro Tip

If you are mixing mortar for a small project, order slightly more than your calculated volume, sand settles and compacts in the pile so a yard on paper delivers a bit less usable volume than expected. It is also worth combining a sand order with a base material delivery if your project needs both, since coordinating one delivery day for a paver job saves you from double staging equipment and cleanup on site.

Working With Sand in Lincoln

Lincoln sits on silty clay loam, soil that already holds moisture and drains slow, so when you are setting pavers or laying block you want a clean, uniform sand base rather than relying on the native ground to do that work. With freeze thaw cycles running from late October through late April here, any bedding sand under a patio or walkway needs to be consistent and well compacted or you will see heaving by the second winter. Masons building around Star City use this for mortar because it is finer and more uniform than concrete sand, which is exactly what makes the mix workable under a trowel.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand?

Yes, this is washed and finely screened natural sand, the same material often called mason sand, particularly for mortar mixing. It is finer and more uniform than concrete sand, which is what gives mortar its workability under a trowel. If your project calls specifically for mason sand, this is the right material.

Answer

How much sand do I need for a paver patio?

One cubic yard covers about 324 square feet at a 1 inch depth, or roughly 162 square feet at 2 inches. Most paver joint work and prep on a mid size patio in Lincoln runs somewhere between half a yard and a full yard, but measure your exact footprint before ordering.

Answer

When should I install sand for a paver or hardscape project?

Hardscape season in Lincoln runs spring through fall, before the ground starts freezing in October. Installing before the first frost gives your base and joint sand time to settle and compact under normal conditions rather than fighting frozen ground or spring thaw softness.

Answer

Where will the sand be placed on delivery day?

The load gets dumped in a pile at a spot on your property that the delivery truck can access, typically a driveway or open yard area. Make sure there is enough clearance for the truck and let us know at checkout if your access is tight or unusual.

Answer

Should I use sand or chip stone under my pavers?

For paver bedding specifically, many installers now prefer clean chip stone because it locks in place and does not pump out under traffic and moisture the way sand can. Sand is still the right choice for mortar mixing and for filling paver joints, so a paver job often uses both materials for different purposes.

More delivery around Lincoln, Nebraska

All Lincoln, Nebraska landscape supply