About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs call for 6 to 12 inches depending on how much grade you're correcting. Measure the low area in square feet, decide on depth based on how much you need to raise it, and order in cubic yards from there. For anything deeper than 12 inches, plan on multiple compacted lifts rather than one thick pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Mercer Fill Dirt Delivery

Mercer Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs call for 6 to 12 inches depending on how much grade you're correcting. Measure the low area in square feet, decide on depth based on how much you need to raise it, and order in cubic yards from there. For anything deeper than 12 inches, plan on multiple compacted lifts rather than one thick pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Mercer Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a cap of topsoil once the grade is corrected, since fill itself isn't meant to grow anything. If the area needs drainage work first, coarse gravel underneath the fill can help move water away from foundations before you build up. Compaction equipment, even a hand tamper for smaller jobs, is worth having on site the day the load arrives.

Mulch Mound Pro Tip

Mercer's silt loam holds moisture longer than sandy soil, so if the ground underneath your fill area is already wet or soft, compact that base layer first before adding fill dirt on top. Skipping this step is the number one reason people see sinking a year or two later, the fill itself was fine but the ground under it never got firm. A hand tamper works for small areas, a plate compactor for anything larger than a patio footprint.

Mulch Mound Pro Tip

The most common mistake with fill dirt is treating it like topsoil and expecting grass or plants to grow directly in it. Fill is a structural material, screened subsoil without the organic content plants need. Once you've reached your target grade and compacted the final lift, cap it with 4 to 6 inches of actual topsoil before seeding or planting, otherwise you'll fight poor drainage and bare patches for seasons.

Mulch Mound Pro Tip

If your project also needs topsoil or gravel, it's worth planning both deliveries close together so you're not paying for two separate site visits and can move straight from fill to cap without the area sitting exposed. With frost setting in by mid October in Mercer, finishing grade work before the ground freezes saves you from restarting compaction in spring once things thaw.

Grading and Filling in Mercer

Mercer's native silt loam compacts differently than sandy or clay soils, it can look solid on top and still settle underneath if fill isn't placed in proper lifts. With an elevation around 1,200 feet and a frost season running roughly October through May, ground that isn't compacted before freeze up will heave and settle unevenly once it thaws. That matters for anything near the Mercer County Courthouse area or older lots downtown where drainage was never engineered well to begin with. Fill dirt gives you the structural base to correct grade before you cap it with a growing medium.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my backyard in Mercer without adding topsoil?

You can use it to correct grade and raise low spots, but fill dirt alone won't support grass or plants since it's subsoil without organic content. If the leveled area needs to grow anything, cap the compacted fill with 4 to 6 inches of topsoil once you've reached your target grade.

Answer

How many cubic yards of fill dirt do I need for a low spot in my yard?

One cubic yard covers about 54 square feet at a 6 inch depth. Measure your low area in square feet, multiply by the depth you need in feet, and that gives you the cubic yardage. Round up slightly since compaction reduces volume once it's placed and tamped down.

Answer

When is the best time to bring in fill dirt before winter hits?

Aim to finish grading and compaction before the ground freezes, which in Mercer typically starts around mid October. Working the fill in while temperatures are still above freezing lets you compact each lift properly, since frozen or partially frozen soil doesn't pack down evenly and can leave voids that settle in spring.

Answer

Where does the delivery truck place the fill dirt on my property?

The truck drops the load at the accessible spot you specify at checkout, so make sure the path is clear of low branches, tight turns, or soft ground that could bog down a heavy truck. Delivery timing is scheduled at checkout rather than a set window, so plan your site access ahead of that date.

Answer

Should I get fill dirt or topsoil for backfilling around my foundation?

Fill dirt is the right choice for foundation backfill, it's a structural material meant to be compacted and hold its grade over time. Topsoil is meant for growing and doesn't compact the same way, so it settles unevenly against a foundation. Use fill dirt for the structural backfill and topsoil only on top if you're finishing with grass or plants.q

More delivery around Mercer, Pennsylvania

All Mercer, Pennsylvania landscape supply