About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how much grade you need to make up. Measure the low area's square footage, decide whether you need one lift or two, and order in whole yards since it is sold and delivered that way. For a foundation backfill or a pool deck build up, it is worth calculating both the 6 inch and 12 inch depth so you know the range before you order.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Middletown Fill Dirt Delivery

Middletown Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how much grade you need to make up. Measure the low area's square footage, decide whether you need one lift or two, and order in whole yards since it is sold and delivered that way. For a foundation backfill or a pool deck build up, it is worth calculating both the 6 inch and 12 inch depth so you know the range before you order.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Middletown Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a few inches of topsoil capping the top lift, since fill dirt itself is not meant to grow anything. If the final surface will be lawn or planting beds, order topsoil for the last layer, and if drainage is part of the problem, some crushed gravel underneath a low spot can help move water away from a foundation.

Mulch Mound Pro Tip

Middletown's silt loam does not drain fast, so if you are filling a low spot that collects water, do not just dump fill dirt on top of standing moisture. Let the area dry out or dig a shallow drainage path first. Compacting wet silt loam over wet subsoil traps water underneath, and that pocket will keep the ground soft and cause settling for a season or two after you thought the job was done.

Mulch Mound Pro Tip

The biggest mistake we see is treating fill dirt like topsoil and dumping it in one thick layer expecting it to hold. It will not, it settles unevenly and you end up with a dip six months later. Place it in 6 to 8 inch lifts and compact each one with a plate compactor or by hand tamping before adding the next. It takes longer but it is the difference between a foundation pad that holds and one that sinks.

Mulch Mound Pro Tip

If your project also needs topsoil on top for grass or beds, order both in the same delivery window so you are not paying for two separate trips. Fill dirt does the structural work, topsoil goes on the last 2 to 4 inches where roots actually live. Trying to skip the fill layer and using topsoil alone for grading is a waste, since topsoil costs more and does not compact the same way.

Grading and Filling in Middletown

Middletown sits low against the Great Miami River in spots, and a lot of the older neighborhoods near downtown deal with silt loam that holds water and settles unevenly over time. Fill dirt is what people here use to bring a low yard or a soggy corner back up to grade before anything else gets built on it. Because the native soil is silty and compacts differently than sandy soil, contractors around here tend to over-build in lifts rather than dump and grade in one pass. It is also the standard first step before pool decks or foundation work near the river, where ground movement is more of a concern.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Middletown?

Yes, for the low or uneven sections, but fill dirt is a structural base, not a finished surface. Build it up in 6 to 8 inch compacted lifts, then cap the top few inches with topsoil if you want grass or plants to grow. Skipping the topsoil cap means nothing will take root well in raw subsoil.

Answer

How many cubic yards do I need to fill a 200 square foot low spot?

At a 6 inch depth, one cubic yard covers about 54 square feet, so 200 square feet needs roughly 3.7 cubic yards, round up to 4. If you need a full 12 inches, double that to around 7.5 yards. Always round up since fill dirt settles some after compaction.

Answer

Does fill dirt need to be installed before winter or can it wait?

Fill dirt is project driven, not seasonal, so there is no bad time to order it. That said, with Middletown's frost setting in around mid October, foundation or pool backfill work is easier to compact properly before the ground freezes. Waiting until after the last frost in late April also works fine if the ground needs to thaw and dry out first.

Answer

Where will the truck put the fill dirt on delivery day?

The driver places the load as close to your project area as the truck can safely access, usually a driveway or curbside spot you designate ahead of time. Fill dirt is heavy, so plan for it to stay near that drop point rather than assuming it will be moved further. Clear the access path and mark the spot before your delivery date.

Answer

Should I get fill dirt or topsoil for backfilling around my foundation?

Fill dirt is the right call for foundation backfill, since it is denser subsoil meant to compact and hold structural weight, not a growing medium. Topsoil is lighter, holds nutrients, and settles differently, so it is a poor choice under a structure. Use fill dirt for the bulk of the backfill and topsoil only on top if grass needs to grow there.

More delivery around Middletown, Ohio

All Middletown, Ohio landscape supply