Ordered Dirt. Received Dirt. Would Buy Again.

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will de...
Read full review
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will definitely use again!
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of cautio...
Read full review
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!
Complete Your Outdoor Project
Mason sand pairs naturally with pavers, natural stone, or brick for anyone doing a patio, walkway, or pool deck around Murfreesboro. Some jobs also call for crushed limestone base material underneath before the sand layer goes down, especially on this area's clay heavy ground. If you're mixing mortar on site, having extra sand on hand keeps a masonry crew from stopping mid pour to reorder.
Service area
Areas we deliver sand in Murfreesboro, Tennessee
Mason sand only works well for mortar if it stays dry until you're ready to mix, so tarp the pile if rain is in the forecast, especially during Murfreesboro's wetter spring stretch. Wet sand throws off your water to sand ratio and makes mortar either too soupy or too stiff to spread evenly, which shows up later as weak joints between brick or block.
A common mistake on paver jobs here is skimping on compaction before adding the sand layer, especially over Murfreesboro's clay subsoil, which shifts more than sandy soil once it gets saturated. Compact your base layer first, screed the sand level, then set your pavers, don't just pour sand over uneven clay and expect it to stay flat through a wet winter.
If you're doing both a paver patio and a mortar based retaining wall, order mason sand for the mortar work and consider chip stone instead of sand for the paver bedding layer, since chip stone locks together and doesn't wash out or pump up through joints the way sand can over time. This can save you from redoing bedding work a few years down the line.
Working With Sand in Murfreesboro
Murfreesboro sits on clay and limestone ground that drains slowly and gets sticky when wet, which is exactly why a clean, uniform sand layer matters for anything you're setting on top of it, whether that's pavers, a paver patio base, or a pool. Mason sand gives you a consistent bedding surface that doesn't hold water the way the native clay does. Around Stones River and the older parts of town where a lot of hardscape and masonry work goes on, contractors lean on this sand for mortar because it mixes workable and doesn't fight the trowel. Zone 7a's freeze thaw cycles each winter can shift base material that isn't compacted right, so starting with the correct sand matters more here than in milder climates.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.