About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much grade needs to change. Measure the low area in square feet, decide your target depth, and that gives you a working yardage number before you order. For bigger jobs like backfilling a pool or raising a building pad, it adds up fast, so it helps to break the area into sections and total them separately.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Newark Fill Dirt Delivery

Newark Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much grade needs to change. Measure the low area in square feet, decide your target depth, and that gives you a working yardage number before you order. For bigger jobs like backfilling a pool or raising a building pad, it adds up fast, so it helps to break the area into sections and total them separately.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Newark Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs in Newark finish with a topsoil cap since fill dirt itself will not support grass or planting beds. If drainage is a concern given the local silt loam, a layer of gravel or crushed stone underneath the fill can help water move instead of pooling against a foundation. Straw or seed mix on top of the final topsoil layer helps hold everything in place through the first few rains.

Map of the fill dirt delivery area around Newark, Ohio

Service area

Areas we deliver fill dirt in Newark, Ohio

Mulch Mound Pro Tip

Fill dirt should go down in lifts of 6 to 8 inches, with each layer compacted before the next goes on top. Skipping compaction is the number one reason people end up with a sunken spot a year later, especially in Newark's silt loam, which holds water and settles more than sandier soils once it dries out and shifts. A hand tamper works for small areas, but rent a plate compactor for anything larger than a patio sized job.

Mulch Mound Pro Tip

Do not plant directly into fill dirt. It is subsoil, stripped of the organic matter that roots need, so cap any area that will grow grass or plants with at least 4 to 6 inches of real topsoil. This is especially important around Newark where the silt loam underneath already runs low on drainage, so a thin topsoil cap over compacted fill can still puddle if you skip proper grading.

Mulch Mound Pro Tip

If you are backfilling around a foundation or pool wall, order a little extra rather than running short mid project. A partial second delivery costs more in wasted time than simply rounding your yardage up front, and having a small reserve pile on site lets you touch up settling spots over the following weeks without scheduling another truck.

Grading and Filling in Newark

Silt loam, which is what most of Newark sits on, compacts differently than sand or clay heavy ground, and it holds moisture longer after our spring thaw and rain, which runs right up through last frost around April 25. That means fill placed without proper lifts can shift as the ground freezes and thaws again come winter. Locally this material shows up most on foundation backfill jobs, low spots near the Licking River floodplain areas, and site prep before new construction. It is a structural material first, so the goal on any Newark job is a stable base, not a growing bed.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my backyard in Newark?

Yes, fill dirt is the standard choice for leveling low or uneven ground. Because Newark sits on silt loam that holds moisture, plan to compact it in 6 to 8 inch lifts rather than dumping it all at once, and cap the finished area with topsoil if you want grass to grow on it.

Answer

How many cubic yards of fill dirt do I need for a 500 square foot low spot?

At a 6 inch depth, one cubic yard covers about 54 square feet, so 500 square feet would need roughly 9 to 10 cubic yards. If you need a deeper fill, say 12 inches, double that estimate to around 18 to 19 yards.

Answer

When is the best time to bring in fill dirt around Newark?

Fill dirt is project driven, not seasonal, so it can go down whenever the ground is not frozen or saturated. Avoid working it right after heavy rain since Newark's silt loam gets soft and hard to compact properly when wet, and try to finish grading work before the ground freezes near mid October.

Answer

Where will the truck place the fill dirt on delivery day?

The truck drops the load as close to your project area as access allows, so clear a path to the drop spot and let us know at checkout if your driveway or gate has any width limits. Delivery day and window are scheduled at checkout, not guaranteed on the spot.

Answer

What is the difference between fill dirt and topsoil for my project?

Fill dirt is subsoil meant for structural jobs like backfilling and raising grade, while topsoil has organic matter and supports plant growth. For most Newark yard leveling jobs, fill dirt goes down first to build up the grade, then a topsoil layer caps it before seeding or planting.

More delivery around Newark, Ohio

All Newark, Ohio landscape supply