About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I c...

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how low the area sits. For a foundation backfill or a low corner of a Palm Bay yard, measure the square footage of the area and the depth you need to raise it, then work backward from the 54 square foot figure to land on a yardage number.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Palm Bay Fill Dirt Delivery

Palm Bay Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I c...

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how low the area sits. For a foundation backfill or a low corner of a Palm Bay yard, measure the square footage of the area and the depth you need to raise it, then work backward from the 54 square foot figure to land on a yardage number.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Palm Bay Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a layer of topsoil on top, especially if grass or plants need to establish over the filled area. Some Palm Bay customers add sand for extra drainage near pool decks or low patios before capping with topsoil. If you are raising a large area, ask about mixed loads so the base and finish materials arrive together.

Mulch Mound Pro Tip

Palm Bay's water table sits close to the surface in a lot of neighborhoods, so fill dirt placed against a foundation or pool wall needs to go down in 6 to 8 inch lifts, each one compacted before the next goes on. Skipping compaction is the number one reason people end up with a sunken spot a year later, especially in sandy soil that settles unevenly once it gets wet.

Mulch Mound Pro Tip

Fill dirt is structural, not a place to plant directly. If you're raising a low area that will eventually have grass or landscaping, cap the compacted fill with 3 to 4 inches of real topsoil before anything goes in the ground. Skipping this step is a common mistake, subsoil alone will not support root growth or hold nutrients the way topsoil does.

Mulch Mound Pro Tip

If your project needs both structural fill and a finished topsoil layer, order them together rather than in separate trips, it saves on delivery trips and lets you compact the fill while the topsoil sits ready to go. For larger backfill jobs around a pool or slab, rough out your cubic yardage first, then round up since compacted fill always settles a bit lower than it looks going in.

Grading and Filling in Palm Bay

Palm Bay sits low and flat with sandy soil that drains fast on top but can leave standing water in yards that were never properly graded. Fill dirt is what corrects that, raising the grade around a slab, filling in after a pool removal, or building a stable base before a shed or patio goes in. Because the native soil here is sandy and shifts, contractors compact fill dirt in lifts rather than dumping it all at once, especially near foundations. It is not a growing medium, so anywhere grass or landscaping needs to come back, a topsoil cap goes on last.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to raise a low spot in my Palm Bay yard where water pools after rain?

Yes, that is one of the most common uses for it here. Palm Bay's flat, low elevation and sandy soil mean water sits in poorly graded yards, and fill dirt raises the grade to move water away from the house. Compact it in lifts and cap with topsoil if grass needs to grow back over it.

Answer

How many cubic yards of fill dirt do I need to backfill around my pool?

It depends on the depth and perimeter, but as a reference, one cubic yard covers about 54 square feet at 6 inches deep. Measure the linear footage around the pool and the width and depth of the gap, then calculate the total volume before rounding up to the next full yard.

Answer

Do I need to compact fill dirt myself or does it settle on its own?

Fill dirt should be compacted as you go, not left to settle naturally. Place it in 6 to 8 inch lifts and compact each layer, especially near foundations or slabs in Palm Bay's sandy soil, or you will see settling and low spots reappear over the next year or two.

Answer

Will the delivery truck be able to access my property in Palm Bay?

Most residential driveways work fine for a standard delivery truck, but tight lots or narrow gate access can be a factor. Let us know at checkout if your access is limited, and clear the drop area of vehicles or debris before delivery day so the load can be placed exactly where you need it.

Answer

Should I get fill dirt or topsoil for leveling my yard?

If you are raising the grade structurally, fill dirt is the right choice since it compacts and holds its shape. Topsoil is for the final few inches where grass or plants will grow. Most Palm Bay leveling jobs use fill dirt as the base and finish with a topsoil cap on top.

More delivery around Palm Bay, Florida

All Palm Bay, Florida landscape supply