About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Really appreciate the care and follow thru that this company had with our order. A hiccup came up but they were quick to respond and address all concerns, which made our garden day a success! Thank you for your prompt care.

One cubic yard covers about 324 square feet at a 1 inch depth, so for mortar beds or paver joint filling you are usually working in smaller volumes than a mulch or gravel job. A typical pool base or joint-filling project for a mid-size patio might need half a yard to a yard, while a full mortar mixing operation for a mason crew running for days could need several yards delivered at once.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Peoria Sand Delivery

Peoria Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Really appreciate the care and follow thru that this company had with our order. A hiccup came up but they were quick to respond and address all concerns, which made our garden day a success! Thank you for your prompt care.

One cubic yard covers about 324 square feet at a 1 inch depth, so for mortar beds or paver joint filling you are usually working in smaller volumes than a mulch or gravel job. A typical pool base or joint-filling project for a mid-size patio might need half a yard to a yard, while a full mortar mixing operation for a mason crew running for days could need several yards delivered at once.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Peoria Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most jobs using this sand also need chip stone for paver bedding, or portland cement if you are mixing mortar on site. If you are doing a pool installation, ask about pairing with a base gravel layer underneath the sand for better drainage given how much Peoria silt loam holds water.

Mulch Mound Pro Tip

If you are mixing mortar in Peoria during the summer months, keep your sand pile covered or shaded, because high humidity off the Illinois River can add moisture to the pile that throws off your water to mix ratio without you noticing. A slightly damp sand pile means less added water needed, and guessing wrong here is one of the most common reasons mortar comes out either too stiff or too soupy on site.

Mulch Mound Pro Tip

A lot of Peoria contractors default to sand for paver joints out of habit, but with our freeze thaw cycles running from October frost through late April thaw, sand joints tend to wash out or get pushed up over a couple seasons. Chip stone locks better and does not pump the way sand does under repeated freezing and thawing, so if joint stability matters more than tradition, it is worth the switch.

Mulch Mound Pro Tip

Order your mortar sand and any paver base materials in the same delivery when possible, since combining loads on one truck run cuts down on separate delivery trips and site disruption. This matters more in Peoria's older neighborhoods near downtown where driveway access is tight and multiple truck visits can get complicated fast.

Working With Sand in Peoria

Peoria sits on silt loam, a soil that already holds moisture and compacts tightly, so when you are setting pavers or laying a mortar bed you want a material that behaves predictably underneath, not one that shifts with the clay-heavy pockets you find near the river bluffs. This sand is uniform enough to give masons consistent mortar, and it works fine for pool bases too. A lot of River City patios and walkways still use it in paver joints, though we are seeing more contractors switch those joints to chip stone since it does not pump up through the pavers over a Peoria winter freeze thaw cycle. For mortar work specifically, this is still the material you want.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand for mortar mixing in Peoria?

Yes, this is washed and finely screened natural sand, which is what people mean when they ask for mason sand. It is finer and more uniform than concrete sand, which is what makes it workable for mortar. If your project is mortar mixing, paver joints, or a pool base, this is the right material.

Answer

How many cubic yards do I need for a paver joint job?

One cubic yard covers about 324 square feet at a 1 inch depth, but paver joint filling uses far less volume than that since you are only filling narrow gaps, not covering a whole surface. Most residential patio joint jobs use well under half a yard, so measure your joint area carefully before ordering.

Answer

When is the best time to schedule a sand delivery in Peoria?

Hardscape and mortar work in Peoria runs heaviest from spring through fall, roughly after the last frost in late April through before the first frost in October. Working outside that window means colder temperatures can slow mortar curing, so most contractors plan sand-heavy projects for the warmer months.

Answer

Where will the truck place my sand delivery?

We place the load wherever you designate at scheduling, typically a driveway or curbside spot with clear truck access. Make sure the area is cleared ahead of time and wide enough for a delivery truck, especially if you are in one of Peoria's older neighborhoods with tighter streets.

Answer

Should I use sand or chip stone for my paver joints?

Sand has traditionally been used for paver joints, but chip stone is increasingly replacing it because it does not pump up through the pavers over repeated freeze and thaw cycles, which Peoria sees plenty of between October and April. If joint longevity matters, chip stone is worth considering, but sand still works well for mortar and pool bases.

More delivery around Peoria, Illinois

All Peoria, Illinois landscape supply