About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much you're raising the grade. Measure the low area's length and width, decide your target depth, and order in cubic yards from there. For deeper fills, plan on building it in stages rather than dumping the full depth at once.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Rockford Fill Dirt Delivery

Rockford Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much you're raising the grade. Measure the low area's length and width, decide your target depth, and order in cubic yards from there. For deeper fills, plan on building it in stages rather than dumping the full depth at once.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Rockford Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs around Rockford finish with a few inches of topsoil capped on top before seeding or sod, since fill dirt itself won't support root growth well. If you're leveling a low spot that stays wet given the area's silt loam, a layer of screened gravel underneath the fill can help with drainage before you build up. Mulch or bark on top of finished beds is a common last step once grading is done.

Mulch Mound Pro Tip

Fill dirt is structural, not decorative, so treat it that way. Place it in 6 to 8 inch lifts and compact each layer before adding the next, whether with a plate compactor or by hand tamping smaller areas. Skipping this step is the number one reason people end up with a sunken patio or a cracked walkway a year or two later, especially in silt loam soils like Rockford's that hold moisture and shift as they dry.

Mulch Mound Pro Tip

A common mistake is planting directly into fill dirt expecting it to grow like topsoil. It won't, because it's subsoil with the organic material screened out. Cap any area you plan to seed, sod, or plant with at least 4 to 6 inches of real topsoil once your fill has settled and compacted properly. Skipping the cap usually means struggling grass and disappointed gardeners by midsummer.

Mulch Mound Pro Tip

If you're filling a large area, it's more efficient to order the full estimated volume in one delivery rather than several smaller ones, since compaction and lift work goes faster when you're not waiting on material. Pair your fill order with a topsoil delivery scheduled for after your fill has settled for a week or two, rather than trying to do both in the same weekend.

Grading and Filling in Rockford

Rockford's silt loam holds water and compacts unevenly, which is part of why so many yards here develop low spots and soggy corners over time. Fill dirt is the fix for that structural problem, whether it's building up ground before a patio, backfilling around a new foundation, or leveling a low area near Anderson Japanese Gardens style plantings before topsoil goes down. With a last frost around May 20 and first frost by October 1, most fill and grading work in this area happens in that window while the ground is workable. This isn't a growing medium, so plan on capping it with topsoil for anything you intend to plant.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level a low spot in my backyard before laying sod?

Yes, that's one of the most common uses for fill dirt. Build it up in 6 to 8 inch compacted lifts to your target grade, then cap with several inches of topsoil before laying sod. Skipping the topsoil layer will leave the sod struggling since fill dirt has no organic content for roots to establish in.

Answer

How many cubic yards of fill dirt do I need for a 200 square foot area?

At a 6 inch depth, one cubic yard covers about 54 square feet, so 200 square feet would need roughly 3.7 cubic yards. If you're going deeper, say 12 inches, plan on close to double that. Rounding up slightly is smart since compaction will reduce your finished volume a bit.

Answer

When is the best time to do fill dirt work in Rockford?

Most people handle grading and fill work between the last frost around May 20 and the first frost around October 1, when the ground is workable and not frozen or waterlogged. Working in silt loam when it's too wet can make compaction difficult, so aim for drier stretches during that window.

Answer

Where will the delivery truck place the fill dirt on my property?

The load gets dumped in one pile at a spot you specify, ideally close to where you're working since moving fill dirt by wheelbarrow adds up fast. Make sure there's clear truck access to that spot, and let us know about any tight driveways or low branches when you schedule delivery at checkout.

Answer

Should I get fill dirt or topsoil for my project?

Fill dirt is for raising grade or backfilling structurally, like around a foundation or a low yard area, and it's not meant to grow anything in directly. Topsoil is the growing medium you'd cap it with. Most grading jobs actually need both, fill dirt for the bulk of the depth and a topsoil layer on top for planting.

More delivery around Rockford, Illinois

All Rockford, Illinois landscape supply