How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Ordered Dirt. Received Dirt. Would Buy Again.
Complete Your Outdoor Project
Most jobs using this sand also need paver base or gravel underneath for structure, plus the pavers or stone themselves on top. If you are mixing mortar, you will want cement on hand before the load arrives so you are not storing damp sand for days. Pool base projects often pair this with a compactable base material for stability under the liner.
Service area
Areas we deliver sand in Vancouver, Washington
Washed mason sand should be dry to slightly damp when you screed it into paver joints, not soaked. In Vancouver's wetter months the sand can hold moisture longer than you expect even after a few sunny days, so spread it out on a tarp for an hour before use if it feels heavy. Wet sand bridges instead of settling flat into joints, which leaves gaps that widen once foot traffic starts.
A common mistake on paver jobs here is skipping the second sweep. Joint sand settles after the first watering or rain, so plan to come back a week later and top off low spots before polymeric sealer or edge restraints go in. Skipping this step is why joints look full at installation and then show gaps by the following spring once things compact under Vancouver's rain cycle.
If your project only needs mortar mixing and not full paver joint fill, you can often get by with a smaller order than the calculator suggests since mortar uses sand in a fixed ratio with cement rather than covering square footage. Ask your mason for the exact mix ratio before ordering so you are not stuck storing an extra half yard of sand on a job site with no cover.
Working With Sand in Vancouver
Vancouver sits on volcanic loam that drains reasonably well but is still soft and workable, which is part of why so many homes here end up doing their own paver walkways and patios rather than pouring concrete. This sand is not for backfilling those loamy beds, it is for the joint work and mortar mixing that holds the hardscape together. With a growing season running from March 20 to November 10, most masonry and paver projects get scheduled in the drier stretch so the sand sets and settles properly instead of washing out in a spring downpour. Homeowners in The Couve using it for pool decking should note our mild elevation and rainfall pattern mean joint sand needs occasional topping off after the wet months.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.