About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Online ordering was really simple and I liked the transparent pricing.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs here call for 6 to 12 inches depending on how much you are raising the grade. If you are filling a low spot that is 10 by 10 feet at 8 inches deep, you are looking at roughly 2.5 cubic yards before compaction, and a bit more once you account for settling. Measure the actual depth needed at the lowest point of the area, not an average guess.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Virginia Beach Fill Dirt Delivery

Virginia Beach Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Online ordering was really simple and I liked the transparent pricing.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs here call for 6 to 12 inches depending on how much you are raising the grade. If you are filling a low spot that is 10 by 10 feet at 8 inches deep, you are looking at roughly 2.5 cubic yards before compaction, and a bit more once you account for settling. Measure the actual depth needed at the lowest point of the area, not an average guess.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Virginia Beach Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs in Virginia Beach get capped with a few inches of topsoil once the grade is set, especially if grass, beds, or sod are going in on top. If drainage is a concern given the flat elevation here, some crews also bring in a layer of gravel or crushed stone for a drainage path before filling over it. None of this is required, but it is worth planning both materials into the same delivery schedule if you already know the layout.

Mulch Mound Pro Tip

Fill dirt is not something you dump and walk away from, especially on sandy ground like most Virginia Beach lots. Place it in lifts of 6 to 8 inches and compact each one before adding the next. Skipping this step is the number one reason people end up with a sunken patio or a cracked walkway a year later, because uncompacted fill keeps settling under its own weight and whatever gets built on top of it.

Mulch Mound Pro Tip

A common mistake is treating fill dirt as a growing medium and planting straight into it. It is subsoil, screened of debris but stripped of the organic matter that grass and plants need. Cap it with several inches of actual topsoil wherever grass, sod, or garden beds are going in, otherwise you will be fighting poor drainage and weak root growth on top of compacted, nutrient-poor ground.

Mulch Mound Pro Tip

If your project also needs topsoil or gravel, coordinate the delivery so the fill goes down and gets compacted first, then the finish material goes on top in the same visit if timing allows. This avoids trucks tracking through a half finished grade and keeps machinery access simpler on tighter city lots near the oceanfront where space to maneuver is often limited.

Grading and Filling in Virginia Beach

Virginia Beach sits at just 12 feet of elevation, and a lot of properties have that classic sandy soil that drains fast but also settles and shifts if it is not compacted right. That combination means low spots, drainage swales next to foundations, and grading around pools show up constantly here. Fill dirt is what people use to correct that before anything else happens, whether it is leveling a yard that pools water after a storm or building a stable pad before a shed or patio goes in. Because the native soil is sandy, contractors here often bring in fill with more clay content to hold shape once compacted.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

How much fill dirt do I need to raise a low spot in my yard?

It depends on the depth, but one cubic yard covers about 54 square feet at 6 inches deep. Measure the lowest point of the area you are correcting, decide how many inches you need to raise it, and calculate from there. Most Virginia Beach yards dealing with drainage issues need somewhere between 6 and 12 inches of fill.

Answer

Will fill dirt settle after it's delivered and spread?

Yes, if it is not compacted properly. Fill dirt should go down in 6 to 8 inch lifts, each one compacted before the next goes on, otherwise the ground keeps settling for months or years afterward. This matters more on sandy soil like ours, where uncompacted fill shifts easily.

Answer

Can I plant grass or landscaping directly in fill dirt?

Not directly. Fill dirt is a structural subsoil, not a growing medium, so it lacks the organic matter and nutrients plants need. Cap the compacted fill with a few inches of topsoil anywhere you plan to seed, sod, or plant, and your grass and beds will establish far better.

Answer

Where will the truck put the fill dirt on delivery day?

The truck dumps the load wherever you direct at your property, so pick a spot with clear access before delivery. Given how sandy the ground gets in parts of Virginia Beach, a firm, dry access path helps the truck get in without leaving ruts in your yard or driveway.

Answer

What's the difference between fill dirt and topsoil?

Fill dirt is screened subsoil meant for structural work, raising grade, backfilling, and building a stable base, it is not meant to grow anything. Topsoil has organic matter and is meant for planting. Most projects here use fill dirt to build up the grade, then cap it with topsoil where anything needs to grow.”

More delivery around Virginia Beach, Virginia

All Virginia Beach, Virginia landscape supply