I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!
Complete Your Outdoor Project
Sand pairs naturally with paver base gravel underneath and edging material to hold the joints in place once the sand is swept in. If you're doing a mortar project, you'll also want your stone or block on site before the sand arrives so the timeline stays tight. Some Waukesha customers pair this sand with chip stone for paver joints when they want better long term stability than sand alone offers.
Service area
Areas we deliver sand in Waukesha, Wisconsin
Mason sand's fine, uniform grain is what makes mortar workable, but that same fineness means it holds water. In Waukesha's clay heavy ground, don't stockpile it directly on soil overnight before a rain, it'll pick up moisture and clump, throwing off your mortar mix ratios. Tarp the pile if rain is forecast, especially during the unpredictable spring stretch before the last frost clears in mid May.
A common mistake on paver jobs here is using mason sand for the joints instead of the base or bedding layer it's suited for. It's finer than concrete sand and tends to wash out or erode under freeze thaw cycles typical of zone 5b winters. If you're finishing joints on a patio near Frame Park or anywhere with foot traffic, consider chip stone instead, since it locks in place and doesn't pump out from underneath pavers.
If your project involves both a paver base and joint filling, order concrete sand or chip stone for the base and reserve mason sand specifically for mortar mixing or pool pad leveling. Combining materials this way avoids paying for the finer, more processed sand where a coarser product would do the job just as well, and it keeps your cubic yard count accurate instead of overbuying one material to cover multiple uses.
Working With Sand in Waukesha
Waukesha sits on silty clay loam, which holds water and gets sticky when wet, so builders here often bring in sand specifically to create a stable, free draining layer that the native soil won't give them. With hardscape season running spring through fall between the last frost on May 15 and first frost on Sept 30, most sand orders in town go toward mortar work, paver joints, and pool base prep during those warmer months. In zone 5b, freeze thaw cycles can shift anything laid on unstable ground, so a properly screeded sand base matters more here than in milder climates. Around Frame Park and other older neighborhoods with mature patios, homeowners are increasingly replacing paver joint sand with chip stone since it resists washout and ant tunneling.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.