About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 300 square foot low spot at that depth runs close to 6 yards. For deeper fills, like backfilling around a foundation or pool wall, figure your cubic footage first, since install depths commonly run 6 to 12 inches and compaction will eat into your numbers. Order by the cubic yard and round up rather than short yourself mid job.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

York Fill Dirt Delivery

York Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 300 square foot low spot at that depth runs close to 6 yards. For deeper fills, like backfilling around a foundation or pool wall, figure your cubic footage first, since install depths commonly run 6 to 12 inches and compaction will eat into your numbers. Order by the cubic yard and round up rather than short yourself mid job.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of York Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a topsoil cap, since fill dirt is a structural base and not something you plant into. If you're building up a bed or lawn area, order topsoil alongside your fill so the crew isn't waiting on a second delivery. Compactable gravel is worth considering too if the fill is going under a patio or shed pad.

Mulch Mound Pro Tip

Fill dirt is not something you dump and walk away from. Place it in lifts no deeper than 6 to 8 inches and compact each layer before adding the next, especially on York's silt loam, which is dense but still settles unevenly if it's not tamped in stages. Skip this step and you'll be watching your yard sink in patches for the next two or three years, right when you thought the job was finished.

Mulch Mound Pro Tip

The most common mistake we see on backfill jobs is trying to grow grass straight into fill dirt. It's subsoil, screened of debris but stripped of the organic matter that turns and root systems need. Cap it with 4 to 6 inches of real topsoil before seeding or sodding, otherwise you'll be fighting bare patches and poor drainage no matter how much fertilizer gets thrown at it.

Mulch Mound Pro Tip

If you're leveling a large area, order fill dirt and topsoil in the same delivery window rather than staggering them, since both trucks need the same clear access point and you'll save yourself a second setup. It also keeps the job moving in one pass instead of losing a weekend waiting on material twice, which matters if you're working around York's spring thaw window before the ground turns workable.

Grading and Filling in York

York's silt loam holds water longer than sandy soil, which means low spots near foundations and along the flat stretches around Central Market tend to stay soggy well into spring. Fill dirt gives you a structural base to raise that grade above the water table before anything else goes on top. With a last frost around April 25, most regrading and backfill work here happens in the spring thaw and again in fall before the ground firms up. Because fill dirt is a project material and not a growing medium, it works the same whether you're closing out a pool excavation or leveling ground for a shed pad.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in York?

Yes, fill dirt is the right material for raising and leveling grade, especially where silt loam holds water and creates low spots. Place it in 6 to 8 inch lifts and compact each one as you go. Cap the finished grade with topsoil if you plan to seed or sod, since fill dirt itself isn't a growing medium.

Answer

How many cubic yards of fill dirt do I need for a 500 square foot area?

At a 6 inch depth, one cubic yard covers about 54 square feet, so 500 square feet needs roughly 9 to 10 cubic yards. If you're filling deeper, say 12 inches, double that to around 18 to 20 yards. Always round up since compaction settles the material lower than it looks on delivery day.

Answer

When's the best time to bring in fill dirt in York?

Fill dirt itself isn't seasonal, it's driven by your project timeline rather than the calendar. That said, most people here schedule regrading work in spring after the last frost around April 25, or in fall before the ground firms up ahead of winter, since wet or frozen soil is harder to compact properly.

Answer

Where will the truck place the fill dirt on delivery day?

We place the load wherever you point us, as close to the work area as the truck can safely access. Clear a path beforehand and let us know if there are tight gates, low branches, or soft ground, since fill dirt is heavy and a shorter carry distance saves you real time moving it by hand.

Answer

Should I get fill dirt or topsoil for my project?

It depends on what you're doing. Fill dirt is subsoil meant for raising grade, backfilling foundations, or building a base, it's not meant to grow anything in. Topsoil goes on top once the grade is set, giving you the organic material roots actually need. Most grading jobs use both, fill first, then a topsoil cap.

More delivery around York, Pennsylvania

All York, Pennsylvania landscape supply