We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Complete Your Outdoor Project
Most paver jobs pair this sand with a compacted gravel base below it and edge restraint to keep the bedding layer from shifting under freeze thaw movement. Mortar work usually means ordering alongside brick, block, or stone. Some crews are shifting paver bedding to clean chip stone instead of sand since it does not pump under joints over time, worth asking about if long term joint stability matters more than tradition.
Service area
Areas we deliver sand in Bloomington, Indiana
Mason sand pulls moisture out of the air more than concrete sand because it is finer, so if you are mixing mortar on a humid Indiana summer day, expect the mix to firm up faster than the bag instructions suggest. Keep water on hand to adjust in small amounts rather than dumping extra sand into a stiffening batch, which throws off your ratio and weakens the joint once it cures.
A common mistake on paver jobs here is screeding the sand bed too far ahead of laying pavers. Bloomington's spring rains can soak an exposed sand layer overnight, and a rain soaked bed compacts unevenly once pavers go down, leading to a wavy surface. Screed only as much as you can cover with pavers the same day, especially April through June when showers are frequent and unpredictable.
If your project is paver bedding rather than mortar, ask about chip stone before committing to sand. It resists the pumping and washout that sand beds can suffer under heavy freeze thaw cycling, which matters given Bloomington's roughly six month frost window. Sand still wins for mortar and pool base work where a fine uniform texture is required, so match the material to the actual job rather than defaulting to habit.
Working With Sand in Bloomington
Bloomington sits on silt loam, which drains slower than sandy soil and holds water after spring rains, so hardscape crews here lean on sand to build a stable, well drained base under pavers and walkways instead of fighting the native clay-ish subsoil directly. With freeze thaw cycles running from mid October to late April, a properly bedded paver base matters more here than in milder climates, since a poorly compacted base heaves. Mason sand also shows up constantly in mortar mixes for the limestone and brick work common around campus and older neighborhoods. Pool base work is common too, since a fine, uniform sand layer protects liners from the area's occasional rocky subsoil.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.