How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Ordered Dirt. Received Dirt. Would Buy Again.
Complete Your Outdoor Project
Sand pairs naturally with paver base gravel and edge restraints on most patio and walkway jobs, and with polymeric jointing sand where joints need to resist weeds and washout. If you are pouring a pool base or mixing mortar, having crushed stone on hand for the sub base keeps the whole job moving without a second delivery.
For paver bedding, many Brookfield contractors have shifted from mason sand to clean chip stone because chip stone does not pump up through joints the way fine sand can over freeze thaw cycles. If you are still using sand for bedding, keep it dry before screeding and compact in thin lifts, since damp sand clumps unevenly under a screed bar and leaves low spots that show up after the first hard rain.
Sand jobs in Brookfield are seasonal for a reason, ground temperatures below freezing make it nearly impossible to properly bed pavers or set mortar. Plan hardscape work for after the last frost around May 7 and wrap up before the ground starts hardening near mid October. Starting a mortar job too early in spring often means fighting moisture in a sand pile that never fully dried out over winter.
If your project needs both mortar sand and a base material like crushed stone, order them together for the same delivery window rather than staggering separate trips. It keeps the job site organized and means you are not waiting on a second load mid project, which matters most during the busy spring and fall stretch when delivery schedules fill up faster.
Working With Sand in Brookfield
Brookfield sits on clay loam that drains slowly, which is exactly why sand shows up in so many local hardscape and drainage projects. It is not a soil amendment here, it is a building material, used to bed pavers on patios, set mortar joints on brick and stone, and line pool bases. With clay loam underneath, contractors often use sand as a leveling layer to keep water from pooling against a paver base or foundation. Hardscape season here runs spring through fall, roughly between the last frost in May and the first frost in October.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.