Inorganic subsoil for filling holes, raising low ground, and backfill. Small rocks and bits of stick or root are normal in the mix, this is structural material and not a growing medium. Do not use it to level a lawn surface or fill flower beds, put topsoil over it for anything you want to plant. Place it in lifts and compact as you go.
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will definitely use again!
Tell us what you're looking for
Thanks! We received your request.
Something went wrong. Please try again.
How Much Fill Dirt Do I Need?
One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural jobs here call for 6 to 12 inches depending on how low the area sits. Measure the square footage of the low spot or backfill zone, decide your target depth, and order in cubic yards from there. For anything deeper than 8 inches, plan on building it up in separate compacted lifts rather than one deep dump. Estimate fill dirt with our free topsoil calculator
What is a Yard?
A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.
We can't take orders for this right now. Tell us what you need and we'll get back to you.
What do you need?
Thanks! We received your request.
Something went wrong. Please try again.
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound
The best local fill dirt, without the guesswork.
We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.
Mulch Mound Guarantee
If your fill dirt isn't the quantity or quality you ordered, we'll make it right.
About this fill dirt
Inorganic subsoil for filling holes, raising low ground, and backfill. Small rocks and bits of stick or root are normal in the mix, this is structural material and not a growing medium. Do not use it to level a lawn surface or fill flower beds, put topsoil over it for anything you want to plant. Place it in lifts and compact as you go.
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will definitely use again!
How Much Fill Dirt Do I Need?
One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural jobs here call for 6 to 12 inches depending on how low the area sits. Measure the square footage of the low spot or backfill zone, decide your target depth, and order in cubic yards from there. For anything deeper than 8 inches, plan on building it up in separate compacted lifts rather than one deep dump. Estimate fill dirt with our free topsoil calculator
What is a Yard?
A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will de...
Read full review
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will definitely use again!
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of cautio...
Read full review
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!
Most fill dirt jobs around Cape Coral finish with a topsoil cap once the grade is where it needs to be, especially if sod or planting beds are going in over it. If you are backfilling near a pool or seawall, a layer of compactable base material under pavers is a common next step. Either way, plan your topsoil or base order around the finished fill grade, not before.
In Cape Coral's sandy soil, fill dirt that goes in all at once tends to bridge over air pockets near the bottom and then slump months later, especially near pool decks where vibration from foot traffic speeds it up. Place it in 6 to 8 inch lifts and compact each one with a plate compactor before adding the next. Skipping this step is the single biggest reason people end up with a sunken patch a year after the job looked finished.
Mulch Mound Pro Tip
A common mistake here is treating fill dirt like it is ready for sod or plants right away. It is subsoil, stripped of the organic matter that helps roots and water move, so anything meant to grow needs a topsoil cap of at least 4 to 6 inches on top of the compacted fill. Skip that step and you will be fighting bare patches and runoff for a full season.
Mulch Mound Pro Tip
If you are filling a large low spot or backfilling along a seawall, order fill dirt for the bulk of the depth and save topsoil or base rock for just the top few inches where it actually matters. This keeps the job cost efficient since fill dirt is the cheaper structural layer, and pairing it with the right finish material on top avoids buying premium product to fill volume it does not need to fill.
Grading and Filling in Cape Coral
At 7 feet of elevation, a lot of Cape Coral properties have low spots that hold water after a heavy afternoon storm, and fill dirt is the material that actually fixes that instead of masking it. The native sandy soil here compacts differently than clay, it settles fast under load but can also wash out at the edges if it is not built up in proper lifts. Fill dirt is used around here mainly for pool decks, seawall backfill, and bringing low yards up before a shed or paver patio goes in. It is not a growing medium, so anything going in on top still needs a topsoil cap.
What Fill Dirt Is
Fill dirt is inorganic subsoil sold for volume and grade, not for growing. Small rocks and bits of stick or root are normal in the mix. It compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.
Fill Dirt vs Topsoil
Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.
Compact in Lifts
Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.
Frequently Asked Questions
Click a question to see the answer
Answer
Is fill dirt the same thing as topsoil in Cape Coral?
No, fill dirt is subsoil screened of debris, used to raise or build up ground. It has none of the organic content topsoil has, so nothing grows well in it directly. If you are planting or seeding after filling, cap the compacted fill with 4 to 6 inches of topsoil.
Answer
How many cubic yards of fill dirt do I need for a low backyard corner?
One cubic yard covers about 54 square feet at 6 inches deep. Measure the square footage of the low area, decide if you need 6 or 12 inches based on how low it sits, then divide accordingly. A 300 square foot area at 8 inches would run roughly 7 to 8 cubic yards.
Answer
Do I need to compact fill dirt before building on it?
Yes, always. Place it in 6 to 8 inch lifts and compact each layer before adding more, especially in sandy soil like Cape Coral has, where uncompacted fill settles unevenly over time. Skipping compaction is the main reason people see sunken spots near pools, sheds, or patios a year or two later.
Answer
Can the delivery truck access a backyard with limited side gate width?
The truck delivers to where it can safely reach, typically the driveway or closest accessible point, and from there material may need to be moved by wheelbarrow if the yard access is narrow. Measure your gate or side yard width beforehand and mention any tight access when placing your order.
Answer
Should I use fill dirt or a compactable base material for pool deck backfill?
Fill dirt works for bulk backfill volume, but the top layer near the surface, especially under pavers, usually needs a compactable base rock for stability. A common approach is fill dirt for the bulk depth and base material for the final few inches under the finished surface.