About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

This was the easiest process to purchase mulch! It arrived on time and the driver did an amazing job putting it exactly where I wanted it. I will be a return customer for sure.

One cubic yard covers about 324 square feet at a 1 inch depth, which is the typical range for paver joint fill or a leveling course. Mortar mixing jobs and pool base work often need less area coverage but more precise volume, so measure your project footprint first and calculate for the 1 to 2 inch install depth you actually need. Most patio and walkway jobs in Carmel run somewhere between a half yard and two yards depending on square footage.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Carmel Sand Delivery

Carmel Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

This was the easiest process to purchase mulch! It arrived on time and the driver did an amazing job putting it exactly where I wanted it. I will be a return customer for sure.

One cubic yard covers about 324 square feet at a 1 inch depth, which is the typical range for paver joint fill or a leveling course. Mortar mixing jobs and pool base work often need less area coverage but more precise volume, so measure your project footprint first and calculate for the 1 to 2 inch install depth you actually need. Most patio and walkway jobs in Carmel run somewhere between a half yard and two yards depending on square footage.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Carmel Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most paver and patio jobs around Carmel pair this sand with a compacted gravel base material underneath and edging to hold the perimeter. If you are doing mortar work for a stone or brick veneer, you will also want to have your cement and lime on hand before delivery. For pool installations, a geotextile fabric under the sand base helps keep it from migrating into surrounding clay soil over time.

Mulch Mound Pro Tip

Carmel's clay subsoil holds water longer than sandy soil regions, so when you are setting a paver bedding layer, make sure your gravel base underneath has real drainage, not just compacted stone sitting on undisturbed clay. Otherwise the sand layer above it stays saturated after storms, which leads to soft spots and paver shifting. A few extra inches of open graded base rock solves this before the sand even goes down.

Mulch Mound Pro Tip

A common mistake on paver joints is sweeping sand in dry and calling it done. Wet it lightly with a hose after the first sweep, let it settle, then sweep in a second pass. This locks the joints tighter and reduces how much sand you have to keep topping off every season, which matters given Carmel's freeze thaw cycles between the October and April frost dates.

Mulch Mound Pro Tip

If your project involves both mortar mixing and paver joint fill, order it as one combined cubic yard estimate rather than two small separate deliveries. It reduces trips and lets you keep leftover material on-site in a covered container for touch ups later in the season, since hardscape work in Carmel often gets revisited as landscaping fills in around it.

Working With Sand in Carmel

Carmel sits on heavy clay soil, which is exactly the kind of ground that makes drainage layers under patios and walkways matter. Sand does not fix clay, but under pavers it gives you a uniform, compactable bedding layer that clay alone cannot provide. With hardscape projects common in the newer Carmel subdivisions and around the Monon corridor, mason sand gets used for both mortar mixing on stone veneer work and joint fill between pavers. Clay soil also means proper base prep matters more here than in sandier regions, so do not skip a compacted aggregate base under any sand layer.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand I would buy at a hardware store?

Yes, it is washed and finely screened natural sand, the same material sold as mason sand in smaller bags. Buying it delivered by the cubic yard is simpler for any project needing more than a few bags, and it is the standard choice for mortar mixing and paver joint work around Carmel.

Answer

How much sand do I need for a 300 square foot patio?

At a 1 inch depth, one cubic yard covers about 324 square feet, so a 300 square foot patio would need roughly one cubic yard for the bedding layer alone. If you are also filling joints, add a bit more, figure closer to 1.1 to 1.2 yards total depending on paver spacing.

Answer

When is the best time to schedule a paver or patio project in Carmel?

Most hardscape work happens spring through fall, roughly after the April 20 last frost and before the October 20 first frost, since sand and mortar both need to cure without freezing. Late spring and early fall tend to have the most workable weather for compaction and mortar setting.

Answer

Can the truck get sand close to my backyard patio project?

Delivery is placed at an accessible point you specify at checkout, typically a driveway or curb area, since trucks cannot cross lawns or tight side yards. For backyard projects, plan on wheelbarrowing material from the drop point, and clear a path beforehand so the crew can move it efficiently.

Answer

Should I use sand or chip stone for my paver base?

Sand is still standard for paver joints and mortar work, but for the bedding layer underneath pavers, many installers now prefer clean chip stone because it does not pump or wash out under freeze thaw cycles. Sand remains the better choice for jointing and any mortar mixing on the same job.

More delivery around Carmel, Indiana

All Carmel, Indiana landscape supply