About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs here run 6 to 12 inches depending on how much you're raising the grade. Measure the low area in square feet, decide your target depth, and that tells you how many yards to order. For anything over a few inches, plan on placing it in lifts rather than one deep dump.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Del Rio Fill Dirt Delivery

Del Rio Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs here run 6 to 12 inches depending on how much you're raising the grade. Measure the low area in square feet, decide your target depth, and that tells you how many yards to order. For anything over a few inches, plan on placing it in lifts rather than one deep dump.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Del Rio Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs get capped with topsoil once the grade is set, especially if grass, beds, or anything else needs to grow on top. If you're backfilling near a pool or foundation, a load of crushed base or gravel for drainage underneath is worth considering before the fill goes in. We can schedule multiple materials for the same delivery window if your project calls for it.

Mulch Mound Pro Tip

Del Rio's chalky clay doesn't compact the same way sandy fill does, so when you're building up a pad, water each lift lightly before compacting it rather than compacting it bone dry. Dry chalky clay resists settling into place and can leave voids that show up as soft spots months later. A hand tamper works for small areas, but rent a plate compactor for anything approaching a shed pad or patio base.

Mulch Mound Pro Tip

The most common mistake we see is dumping fill dirt in one deep pour and calling it done. Uncompacted fill keeps settling for a year or more, sometimes cracking new concrete or leaving a dip where a pool deck meets the yard. Build it in 6 to 8 inch lifts, compact each one, and give it time between lifts if the job allows. Slower up front means it stays put.

Mulch Mound Pro Tip

Order slightly more than your calculated number, since compaction reduces volume by roughly 10 to 15 percent once each lift settles. It's more efficient to size the load right the first time than to schedule a second small delivery for a gap you didn't account for. If you're also ordering topsoil to cap the fill, having both delivered close together keeps the project moving without the yard sitting half graded.

Grading and Filling in Del Rio

Del Rio sits on chalky clay that swells when it gets rain off the Rio Grande and cracks hard in the long dry stretches between, which means low spots near foundations and pool decks tend to hold water and settle unevenly year after year. Fill dirt gives you a structural base to correct that grading before anything else goes on top. Around the Amistad area and older parts of town where lots were leveled decades ago, we see a lot of build up jobs ahead of patios, sheds, and drainage corrections. This is subsoil, not something to plant into, so treat it as the foundation layer under your project, not the finish.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I plant grass or a garden directly in fill dirt?

No, fill dirt is subsoil meant for structural grading, not growing. It lacks the organic content plants need and compacts too dense for root growth. Cap it with several inches of topsoil once your grade is set, then plant into that layer instead.

Answer

How many cubic yards do I need to raise a 200 square foot low spot by 8 inches?

At 6 inches, one cubic yard covers about 54 square feet, so for 8 inches you'll need roughly 5 to 6 cubic yards for 200 square feet, plus a bit extra for compaction loss. Measure your actual low area first since real yards rarely come out square.

Answer

Do I need to compact fill dirt right away or can it wait?

Compact each lift as you place it rather than waiting. Uncompacted fill in Del Rio's clay soil keeps shifting with wet and dry cycles, and waiting just means more settling later once you've already built on top of it. Rent a plate compactor for anything larger than a small patch job.

Answer

Where will the truck place the fill dirt on delivery day?

The load gets dropped as close to your work area as the truck can safely access, so clear a path and mark your spot ahead of time. Fill dirt is heavy and moving it far by hand or wheelbarrow adds real time to your project, so plan the drop location with that in mind.

Answer

Should I order fill dirt or topsoil for my project?

Fill dirt is for raising grade and structural backfill, topsoil is for the finish layer where you're planting. Most projects here use both, fill dirt to build up the base and topsoil capping it on top. If nothing needs to grow, fill dirt alone gets the job done.

More delivery around Del Rio, Texas

All Del Rio, Texas landscape supply