About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I c...

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, which is the typical bedding layer for paver joints and pool bases. If you are going closer to 2 inches for a mortar mixing station or a thicker leveling bed, plan on roughly half that coverage per yard. Measure your patio or paver footprint first, then order by the cubic yard rather than guessing bag counts.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Fond du Lac Sand Delivery

Fond du Lac Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I c...

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, which is the typical bedding layer for paver joints and pool bases. If you are going closer to 2 inches for a mortar mixing station or a thicker leveling bed, plan on roughly half that coverage per yard. Measure your patio or paver footprint first, then order by the cubic yard rather than guessing bag counts.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Fond du Lac Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most sand orders in Fond du Lac go out alongside paver base gravel or crushed stone for the compacted sub layer underneath. If you are mixing mortar on site, we can also deliver bagged cement separately for the crew to combine at the job. Chip stone is worth asking about too, since some local crews are moving away from sand bedding toward chip stone that will not pump out from under pavers.

Mulch Mound Pro Tip

For mortar mixing in Fond du Lac's drier fall air, keep your sand covered between batches so it does not dry out unevenly, which throws off your water ratio and makes the mix crumbly. A tarp weighted at the corners works fine on site. This matters more here than in humid climates because our fall air pulls moisture out of an open pile faster than most people expect.

Mulch Mound Pro Tip

A common mistake on paver jobs here is skipping the screed step after spreading sand, which leaves low spots that show up as puddling once Fond du Lac's spring rains hit the silt loam base beneath. Screed your bedding layer flat and consistent before setting any pavers, using pipe or conduit as guides, then pull them out and fill the grooves with the same sand.

Mulch Mound Pro Tip

If your project also needs paver base gravel, order both in the same delivery to save a second trip charge and driveway disruption. Many local contractors stage the gravel first, compact it, then bring in the sand layer on the same visit, which keeps a job moving over a single weekend before Fond du Lac weather turns.

Working With Sand in Fond du Lac

Fond du Lac sits on silt loam that holds water and turns soft after spring thaw, which is exactly why sand matters here for drainage layers under pavers and patios. Once the ground freezes solid from late fall through mid April, hardscape crews wait for it to firm back up, so most sand orders land between May and October. With a 5b winter that pushes frost deep into the soil, a proper sand bedding layer helps prevent the heaving that cracks paver joints every spring. Pool installers around town also use it for base leveling before the ground refreezes next season.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same sand used for mortar and paver joints, or do I need different kinds?

This is one washed, finely screened sand suited to both mortar mixing and paver joint filling, since it is more uniform than coarser concrete sand. If your project is a paver bedding layer specifically, ask us about chip stone instead, since many local crews now prefer it because it will not pump out from underneath the pavers.

Answer

How many cubic yards do I need for a 300 square foot patio joint fill?

At a 1 inch depth, one cubic yard covers about 324 square feet, so a 300 square foot patio would need just under one full yard for joint filling. If you are also using it as a base leveling layer at 2 inches, plan closer to two yards total for the same footprint.

Answer

When is the best time to schedule a sand delivery in Fond du Lac?

Most hardscape work here happens between May and October, once the ground has thawed and firmed up after our winter freeze. Ordering in early spring right after last frost on April 15 lets you get ahead of the season before contractor schedules fill up through summer.

Answer

Where will the sand be dropped on my property?

Our driver places the load as close to your work area as your driveway or yard access allows, so let us know if you have tight gate clearance or a steep grade. Clear a spot at least a truck width wide beforehand and put down a tarp if you want to protect the surface underneath the pile.

Answer

Should I use sand or chip stone under my new pavers?

Traditional sand bedding is still common and works fine for many patios, but chip stone has become the preferred choice for paver bases in this area because it locks together and does not pump out from underneath the pavers over time. If your project is mortar mixing or joint filling instead of a bedding layer, sand remains the right material.

More delivery around Fond du Lac, Wisconsin

All Fond du Lac, Wisconsin landscape supply