About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Really appreciate the care and follow thru that this company had with our order. A hiccup came up but they were quick to respond and address all concerns, which made our garden day a success! Thank you for your prompt care.

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar or paver joint work calls for 1 to 2 inches depending on the application. For paver joints and pool base leveling, figure your square footage and depth first, then order the cubic yards that match, since sand is sold and delivered by the yard here.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

A ton is 2,000 pounds of material. As a general guideline, one ton of rock covers roughly 100 square feet at 2 inches deep, depending on rock size and density.

Gilbert Sand Delivery

Gilbert Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Really appreciate the care and follow thru that this company had with our order. A hiccup came up but they were quick to respond and address all concerns, which made our garden day a success! Thank you for your prompt care.

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar or paver joint work calls for 1 to 2 inches depending on the application. For paver joints and pool base leveling, figure your square footage and depth first, then order the cubic yards that match, since sand is sold and delivered by the yard here.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

A ton is 2,000 pounds of material. As a general guideline, one ton of rock covers roughly 100 square feet at 2 inches deep, depending on rock size and density.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Gilbert Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Mason sand pairs with paver base gravel and edge restraint for a full paver installation, or with portland cement and lime for mortar batches on block and brick work. Some crews here are shifting to clean chip stone for paver bedding since it will not pump moisture up through joints the way sand can, worth asking your contractor which they spec.

Mulch Mound Pro Tip

Gilbert's caliche clay base means poor drainage under any paver or patio project, so grade the sub base away from structures before you ever place bedding sand. If water pools under a paver patio during monsoon storms, sand shifts and joints open up within a season. Address drainage first, then bring in your bedding material, or you will be re-leveling pavers by next summer.

Mulch Mound Pro Tip

A common mistake on mortar jobs here is mixing in direct afternoon sun during summer, which flash dries mortar before it sets properly. Crews who work with mason sand in Gilbert schedule mixing and placement for early morning hours from May through September. The sand itself does not care about heat, but your mortar working time drops fast once temperatures climb past 100.

Mulch Mound Pro Tip

If your project is paver joints only, order less sand than you think, since joint volume is small compared to total patio area, most jobs need well under a full yard for joints alone. Save the larger yardage orders for mortar mixing or pool base leveling, where volume adds up fast across a full deck or wall run.

Working With Sand in Gilbert

Gilbert sits on caliche clay, a hard alkaline layer that does not drain and does not mix well with sand for backfill purposes, so this is not a soil amendment here. It is a build material, used for mortar batches, bedding joints between pavers, and leveling pool decking bases before hardscape season kicks into gear each spring. With Gilbert's long dry stretch between last frost in February and first frost in December, sand stays workable outdoors nearly year round, which is part of why hardscape crews here run steady schedules through fall.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as regular sand from a hardware store bag?

No, this is washed and finely screened mason sand, more uniform in grain size than the coarser sand sold in bags for general fill. That consistency is what makes mortar workable and keeps paver joints packed tight. Bagged sand varies more and is not practical in the volumes hardscape jobs actually need.

Answer

How many cubic yards do I need for a paver patio's joints?

One cubic yard covers about 324 square feet at 1 inch deep, but joint sand only fills the gaps between pavers, not the full patio surface. Most residential paver jobs need well under a full yard for joints alone. Measure your patio square footage and estimate joint area at a small fraction of that before ordering.

Answer

Can I place sand right before monsoon season hits?

You can, but loose sand for bedding or leveling is vulnerable to washout during heavy monsoon downpours before pavers or a base course locks it in place. If you are working through summer, plan to compact and cover your work the same day, or schedule delivery close to when you are ready to place it rather than staging it early.

Answer

Where will the sand be dropped and do I need to be home?

The load is placed at the driveway or curb location you specify at checkout, and you do not need to be present as long as access is clear. Make sure gates are unlocked and the drop zone is free of vehicles or obstacles before your scheduled delivery date.

Answer

Should I use sand or chip stone for my paver base?

Sand has been the traditional choice for paver bedding, but many crews are moving to clean chip stone because it will not pump up through joints the way sand can over time. If your project is mortar mixing or pool base work, mason sand is still the right call. For paver bedding specifically, ask your installer which they prefer.

More delivery around Gilbert, Arizona

All Gilbert, Arizona landscape supply