
How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Ordered Dirt. Received Dirt. Would Buy Again.
Complete Your Outdoor Project
Sand pairs naturally with paver base or crushed stone for the structural layer beneath it, and with polymeric jointing sand or standard mason sand depending on whether the job is joints or mortar. If you are also setting a pool, a load of paver base under the sand cushion gives you a more stable, level foundation before backfilling.
Service area
Areas we deliver sand in Janesville, Wisconsin
For mortar mixing in Janesville's freeze thaw climate, keep your sand to cement ratio consistent and avoid working in temperatures below 40 degrees, since mortar that does not cure properly before a hard freeze can crack and crumble by spring. If you are pouring in shoulder season, cover fresh work overnight when frost is forecast.
A common mistake with paver joints is using this sand loose without polymeric additive, especially in silt loam areas where soil moisture wicks upward. Plain sand joints wash out faster here than in sandier native soils, so either compact it thoroughly in lifts or switch to a polymeric product for anything getting regular foot traffic.
If your project is bedding rather than joints or mortar, ask about chip stone instead. It has been replacing sand for paver bedding because it will not pump or wash out under freeze thaw cycles the way sand can, and pairing it with sand for joint work only, rather than both layers, often reduces total material needed.
Working With Sand in Janesville
Janesville sits on silt loam, which drains slowly and holds moisture longer than sandy soils, so hardscape crews here lean on sand for the parts of a job where drainage and precision matter more than what the native soil is doing underneath. Paver patios and walkways around Bower City homes still spec sand for mortar and joint work even as bedding practices shift. With Zone 5b winters bringing real freeze thaw cycles, a well screened, uniform sand base under mortar work resists the heaving that coarser or inconsistent material invites. Most of this material moves through town between the last frost in late April and first frost in early October, when concrete and masonry work is actually happening.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.