About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of mason sand covers roughly 324 square feet at a 1 inch depth, so a small mortar batch or a paver joint job on a single patio might only need a fraction of a yard. Larger paver installs or pool base prep at a 2 inch depth will use material faster, closer to half a yard per 324 square feet. Since it is sold by the cubic yard, round up slightly rather than run short mid pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Jonesboro Sand Delivery

Jonesboro Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of mason sand covers roughly 324 square feet at a 1 inch depth, so a small mortar batch or a paver joint job on a single patio might only need a fraction of a yard. Larger paver installs or pool base prep at a 2 inch depth will use material faster, closer to half a yard per 324 square feet. Since it is sold by the cubic yard, round up slightly rather than run short mid pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Jonesboro Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Mason sand pairs naturally with brick, block, and paver deliveries, especially on jobs where mortar mixing and joint fill happen the same week. Some crews also order clean chip stone alongside it for paver bedding, since chip stone resists pumping better than sand under freeze thaw cycles. If you are pouring a pool base, a load of gravel for drainage underneath is worth considering too.

Map of the sand delivery area around Jonesboro, Arkansas

Service area

Areas we deliver sand in Jonesboro, Arkansas

Mulch Mound Pro Tip

Mason sand is noticeably finer than concrete sand, which is exactly why it works for mortar, but that fineness means it holds water differently. On silt loam sites like much of Jonesboro, keep your sand pile covered or tarped before mixing if rain is in the forecast, because wet sand throws off your mortar ratio fast and makes brickwork inconsistent from batch to batch.

Mulch Mound Pro Tip

A common mistake is using mason sand for paver joint fill and expecting it to stay put long term. It shifts and washes out with heavy rain, which is why many crews around town have moved to chip stone for that specific job. Save the mason sand for mortar mixing and pool base work where its fine, uniform grain actually earns its keep.

Mulch Mound Pro Tip

If your project needs both mason sand for mortar and gravel for a base layer, ordering them together on the same delivery day saves a trip and keeps your job site organized instead of juggling two separate deliveries. Spring and early fall are the busiest hardscape stretches here, so locking in your sand order a few days ahead of your build date helps avoid scheduling gaps.

Working With Sand in Jonesboro

Jonesboro sits on silt loam, which drains slower than sandy ground, so masons here lean on mason sand to keep mortar workable on brick and block jobs, a big deal in a city that has earned the nickname City of Churches with all its brick construction. Hardscape crews also use it for paver joint fill on patios near Craighead Forest Park homes, though more are switching to chip stone for that job since it does not pump out over time. With growing zone 7b summers and a frost window running late October to mid April, most sand work here happens spring through fall when mortar and paver crews are actively building.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand I would buy in bags?

Yes, it is washed and finely screened natural sand, the same material sold in bags as mason sand, just delivered in bulk by the cubic yard instead of small bags. It is finer and more uniform than concrete sand, which is what makes it workable for mortar mixing on brick and block jobs common around Jonesboro.

Answer

How much sand do I need for a small paver patio?

One cubic yard covers about 324 square feet at a 1 inch depth, so a typical 200 to 300 square foot patio job needs close to a full yard for joint fill alone, less if you are only doing mortar mixing on a smaller project. Measure your square footage first and round up slightly.

Answer

When is the best time to start a mortar or paver project here?

Most masonry and paver work in Jonesboro happens spring through fall, outside the frost window that runs late October through mid April. Cold, wet ground makes mortar harder to work and paver bases harder to compact properly, so scheduling your project in the warmer months gives you more reliable results.

Answer

Where will the sand be placed when it is delivered?

The driver places the load at a drop spot on your property that has clear truck access, usually a driveway or the edge of a job site. Delivery day is scheduled at checkout, and it helps to have the area marked and clear of vehicles or obstacles beforehand.

Answer

Should I use mason sand or chip stone under my pavers?

Mason sand has traditionally been used for paver bedding, but many crews are switching to clean chip stone because it does not pump or wash out the way sand can over time. Mason sand still works well for mortar mixing and pool base prep where its fine, uniform texture is an advantage.

More delivery around Jonesboro, Arkansas

All Jonesboro, Arkansas landscape supply