About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard covers roughly 324 square feet at a 1 inch depth, and most paver joint or mortar work only calls for 1 to 2 inches. For a typical 300 square foot patio project, budget around 1 cubic yard if you are filling joints thin, or closer to 2 yards if you are bedding at the deeper end of that range. Measure your actual square footage first since sand is dense at 1.35 tons per yard and overordering gets expensive fast.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Kalamazoo Sand Delivery

Kalamazoo Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard covers roughly 324 square feet at a 1 inch depth, and most paver joint or mortar work only calls for 1 to 2 inches. For a typical 300 square foot patio project, budget around 1 cubic yard if you are filling joints thin, or closer to 2 yards if you are bedding at the deeper end of that range. Measure your actual square footage first since sand is dense at 1.35 tons per yard and overordering gets expensive fast.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Kalamazoo Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most paver jobs pair this sand with edge restraints and either paver base gravel or the chip stone that is increasingly replacing sand as bedding material. If you are mixing mortar, you will also want your cement and lime on hand before the load arrives so you are not storing wet sand longer than necessary. Pool base installs often call for a geotextile fabric layer underneath.

Mulch Mound Pro Tip

Mason sand and mortar sand are basically the same product, washed and screened fine and uniform so it blends smoothly with cement and lime without clumping. If you are mixing mortar yourself, keep the sand dry until you are ready to work, Kalamazoo humidity swings can leave stockpiled sand damp enough to throw off your water ratio, especially in the muggier summer months.

Mulch Mound Pro Tip

A common mistake on paver jobs is using this sand as the bedding layer under the pavers themselves. It is built for joint fill, not for the structural base, and it can migrate or wash out over time with Kalamazoo's freeze thaw cycles. Many local crews now use compacted chip stone for bedding and save this material strictly for sweeping into the joints after pavers are set.

Mulch Mound Pro Tip

Since Kalamazoo winters bring real freeze and thaw action, finish joint filling and mortar work well before the Oct 11 first frost so everything has time to set and cure properly. Rushing a mortar job into cold weather leads to weak bonds that crack by spring. If your project timeline is tight, order early in the fall rather than scrambling in October.

Working With Sand in Kalamazoo

Kalamazoo sits on sandy loam soil already, so this material is not fighting your existing yard, it is finishing a build on top of it. Most calls we get are for paver joint fill on patios going in during the spring and summer months, and for mortar mixes on brick and block projects common in older Kalamazoo neighborhoods. With zone 6a winters and a frost line that runs deep by January, any hardscape base work needs to be done before that Oct 11 first frost locks up the ground. We also see steady demand for pool base prep once the weather warms past last frost in May.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as the sand used for pool bases and paver joints, or do I need something different for each?

It is the same washed, finely screened sand for both uses. The fine, uniform grain that makes it workable for mortar also makes it settle smoothly under a pool liner and sweep cleanly into paver joints. You do not need to order separate materials for these two applications.

Answer

How much sand do I need for a 200 square foot patio's paver joints?

At a 1 inch fill depth, one cubic yard covers about 324 square feet, so a 200 square foot patio would use well under a full yard for joint fill alone. Most homeowners round up to a full yard anyway since it is dense at 1.35 tons per yard and a small extra amount is easy to store or reuse.

Answer

When is the best time to install pavers or do mortar work in Kalamazoo?

Spring through fall is the real window here, once you are past the last frost around May 10 and well before the first frost hits around Oct 11. Working outside that window risks poor curing on mortar and frost heave issues on freshly set paver joints. Late spring and early fall tend to have the most workable conditions.

Answer

Where will the delivery truck place the sand, and do I need to be home?

You choose the drop location, usually a driveway or curbside spot, when you schedule at checkout. You do not need to be present, but the area should be clear and accessible so the truck can place the load without obstruction. Delivery timing itself is set during checkout, not guaranteed to a specific day in advance.

Answer

Should I use this sand or chip stone for my paver bedding layer?

Many local hardscape crews are moving toward chip stone for bedding because it locks in place and does not pump or shift the way sand can under freeze thaw cycles. This sand is still the right choice for joint fill and mortar mixing. If you are unsure which your project needs, tell us the application and we can help size the order.

More delivery around Kalamazoo, Michigan

All Kalamazoo, Michigan landscape supply