Ordered Dirt. Received Dirt. Would Buy Again.

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will de...
Read full review
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will definitely use again!
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of cautio...
Read full review
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!
Complete Your Outdoor Project
Most fill jobs finish with a layer of topsoil on top since fill dirt itself isn't meant to grow anything. If the area will see foot traffic or drainage issues afterward, a base layer of crushed gravel underneath the fill can help with stability, especially in the heavier loam common around Kalispell. Mulch or bark comes later, once the finished grade is set and planting beds are in.
Service area
Areas we deliver fill dirt in Kalispell, Montana
Kalispell's loam holds moisture longer than sandier soils, so fill dirt delivered after a rain or during spring runoff will be heavier and harder to compact evenly. If you have flexibility, order during a dry stretch. When you can't avoid damp conditions, spread it in thinner lifts, closer to 4 to 6 inches, and let each one firm up a bit before adding the next, otherwise you'll get soft spots that show up as sinking a year later.
The most common mistake on fill jobs is dumping the full depth at once and calling it done. Fill dirt is a structural material, not topsoil, and uncompacted fill keeps settling for one to two years, sometimes longer. Compact every 6 to 8 inch lift with a plate compactor or hand tamper before adding the next layer. Skipping this step is why people end up with a sunken patch by a foundation or patio the following spring.
If you're building up a large area before topsoil, order fill dirt for the bulk of the depth and save topsoil for just the top 4 to 6 inches where roots actually need it. This keeps costs down since fill dirt is a lower cost material than screened topsoil, and it performs better structurally anyway. Ask about combining a fill dirt and topsoil delivery on the same trip if your project needs both.
Grading and Filling in Kalispell
Kalispell sits at almost 3,000 feet with loam soil that holds water well but also settles unevenly when it's disturbed, which is exactly what happens around new foundations, pool excavations, and drainage corrections. With a frost season running mid September to mid May, anything left unfinished or poorly compacted in the fall gets pushed around by freeze thaw cycles all winter. Fill dirt gives you a stable base to build on before that cycle starts, provided it's compacted in lifts rather than dumped and left. This is job dirt, not garden dirt, so plan on capping it with topsoil wherever grass, beds, or anything else needs to grow.
What Clean Fill Is
Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.
Fill Dirt vs Topsoil
Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.
Compact in Lifts
Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.