About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most projects call for 6 to 12 inches depending on how much grade you need to make up. Measure the low area in square feet, decide on your depth, and order in cubic yards from there. For anything deeper than 8 inches, plan to place it in lifts rather than one pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Louisville Fill Dirt Delivery

Louisville Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most projects call for 6 to 12 inches depending on how much grade you need to make up. Measure the low area in square feet, decide on your depth, and order in cubic yards from there. For anything deeper than 8 inches, plan to place it in lifts rather than one pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Louisville Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Fill dirt does the structural work, but it is not meant to grow anything, so most jobs finish with a cap of topsoil once the fill is compacted and graded. If the area will see grass or plants, plan on topsoil as a final layer before seed or sod. Some customers also add gravel underneath fill near foundations or low drainage spots for extra stability.

Mulch Mound Pro Tip

Fill dirt is a structural material, not something to just dump and grade. Place it in 6 to 8 inch lifts and compact each layer before adding the next, especially if you are backfilling against a foundation or pool wall. Skipping compaction is the number one reason people end up with sunken spots a year or two later, particularly in Louisville's clay soil which holds water and shifts more than sandy ground does.

Mulch Mound Pro Tip

A common mistake is treating fill dirt as a finished surface for planting. It has no organic matter and compacts hard, so nothing grows well in it directly. Always cap the compacted fill with 4 to 6 inches of real topsoil before seeding or sodding, and give the fill time to settle through at least one freeze thaw cycle before you finish grading on top of it.

Mulch Mound Pro Tip

If you are backfilling a large area, it often makes sense to combine fill dirt for the bulk of the depth with a smaller topsoil order for the finish layer, rather than using topsoil the whole way down. Fill dirt is the more economical choice for the structural portion of the job, and saving the topsoil for just the top few inches stretches your budget further without compromising what you're planting into.

Grading and Filling in Louisville

Louisville sits on heavy clay that drains slowly, so low areas near foundations and pool decks tend to stay soft or hold puddles after a storm. Fill dirt gives you a structural base to bring those spots up to grade before topsoil or sod goes on top. With frost setting in around late October and not letting go until mid April, getting fill placed and compacted in the fall gives it a full season to settle before spring planting season. This is job driven work, not something tied to a calendar, but the freeze thaw cycle here is worth planning around.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

What is fill dirt actually made of and is it clean?

Our fill dirt is subsoil from local excavation sites, screened to remove rocks, roots, and construction debris. It is not topsoil and has little to no organic matter, which is exactly what you want in a structural fill, since organic material breaks down over time and causes settling.

Answer

How much fill dirt do I need to raise a low spot in my yard?

One cubic yard covers about 54 square feet at a 6 inch depth. Measure the square footage of the low area, decide how many inches you need to raise it, and scale from there. Most yards in Louisville's clay soil need 6 to 12 inches to correct drainage issues around foundations or patios.

Answer

When is the best time to bring in fill dirt before winter?

Louisville's first frost usually lands around October 25, so getting fill placed and compacted before then gives it a chance to settle before the ground freezes. If you miss that window, fill can still be placed in cooler months, just expect the clay subsoil underneath to be harder to work with once it is cold and wet.

Answer

Where will the truck place the load and do I need to prepare anything?

The driver places the load as close to your marked drop spot as the driveway or access point allows, so clear the area and let us know at checkout if there are gates, slopes, or tight turns to navigate. Standard delivery drops the material in one pile, so plan on moving it by wheelbarrow if it needs to go further into the yard.

Answer

Should I use fill dirt or topsoil for my project?

Use fill dirt for raising grade, backfilling foundations, or building up a base, it is a structural material meant to compact solid. Use topsoil only as the final few inches where you actually want grass or plants to grow. Most projects that need real depth use fill dirt for the bulk of it and cap with topsoil on top.

More delivery around Louisville, Kentucky

All Louisville, Kentucky landscape supply