About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 10 by 10 foot low spot needs roughly two yards to bring it up to grade. For deeper builds, like an 8 to 12 inch lift around a foundation or pool wall, plan on closer to one yard per 45 to 65 square feet depending on how deep you go. Measure the area and the depth you need before ordering, since fill is heavy and running short means a second delivery.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Mankato Fill Dirt Delivery

Mankato Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 10 by 10 foot low spot needs roughly two yards to bring it up to grade. For deeper builds, like an 8 to 12 inch lift around a foundation or pool wall, plan on closer to one yard per 45 to 65 square feet depending on how deep you go. Measure the area and the depth you need before ordering, since fill is heavy and running short means a second delivery.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Mankato Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Fill dirt does the structural work, but it is not a growing medium, so most jobs finish with a few inches of topsoil capped on top wherever grass, beds, or plantings are going in. If you are backfilling around a foundation or pool wall, a layer of coarse sand or gravel at the base can help with drainage before the fill goes in. Mulch or a top layer of topsoil finishes off any area that needs to look finished rather than just be structurally sound.

Mulch Mound Pro Tip

Fill dirt should go down in lifts of 6 to 8 inches, each one compacted before the next goes on, or you will get settling for years afterward. This matters more in Mankato than in sandier regions because our clay loam base already drains slowly, so an uncompacted fill layer traps water and slumps unevenly once frost works into it. A hand tamper works for small areas, but anything over a few yards is worth renting a plate compactor for.

Mulch Mound Pro Tip

The most common mistake we see locally is people filling right up to finish grade and planting into it directly. Fill dirt is subsoil, stripped of the organic material that makes topsoil workable, so anything planted straight into it struggles. Always cap with 4 to 6 inches of topsoil where grass or beds are going, and save the fill for what is underneath.

Mulch Mound Pro Tip

If you are backfilling a large low area, order fill and topsoil together in one delivery window rather than as two separate trips. It saves on repeated delivery scheduling and lets you compact the fill and cap it with topsoil the same weekend, which matters here since our frost season limits how many good working months you get for outdoor grading work each year.

Grading and Filling in Mankato

Mankato sits on silty clay loam that drains slowly and holds water in low spots after spring melt and summer storms. Fill dirt is what fixes that, raising grade around foundations and low corners of the yard so water moves away from the house instead of sitting on it. With frost heaving common here through the winter, especially with a first frost around October 3 and frozen ground lasting into May, compacted fill matters more than in warmer climates because poorly settled fill will shift as it freezes and thaws. Most of the fill work we deliver for goes toward foundation backfill, pool removals, and building up low yards before a topsoil cap.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Mankato?

Yes, fill dirt is the right material for raising low grade across a yard, especially given how slowly our clay loam soil drains. Place it in compacted 6 to 8 inch lifts rather than one thick pour, and cap the top few inches with topsoil if you plan to seed grass or plant anything in the leveled area.

Answer

How many cubic yards of fill dirt do I need for a 200 square foot low spot?

At a 6 inch depth, one yard covers about 54 square feet, so 200 square feet needs roughly four cubic yards. If you are going deeper, closer to 12 inches to fully correct the low area, plan on around seven to eight yards, and round up since compaction will settle the finished depth.

Answer

When is the best time to bring in fill dirt before winter hits?

Aim to finish grading and compacting before the ground starts freezing, which in Mankato is usually by early October. Working the fill while the ground is still workable lets it settle and compact properly before frost, rather than trying to place and tamp material into partially frozen clay loam later in the season.

Answer

Where can the delivery truck place the fill dirt on my property?

The truck can drop the load on a driveway, along a curb, or at any accessible point close to your work area, whatever spot you choose at checkout. Make sure the drop zone is clear and reachable for a full size delivery truck, and have a plan to move the material promptly since a large pile can be tough to relocate later.

Answer

Should I get fill dirt or topsoil for backfilling around my foundation?

Use fill dirt for the bulk of the backfill since it is denser, compacts well, and is meant for structural work rather than growing anything. Cap the last few inches with topsoil only if grass or plants are going in right against the foundation, otherwise fill dirt alone gets the job done and costs less to move in volume.

More delivery around Mankato, Minnesota

All Mankato, Minnesota landscape supply