Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).
We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!
Complete Your Outdoor Project
Most hardscape jobs pair this sand with base gravel underneath and either paver joint sand or chip stone on top, depending on which bedding approach you're using. If you're mixing mortar, keep a portland cement supply on hand since ratios matter more than volume. Edging material also comes up often on the same job.
Mason sand's fine, uniform grain is what makes mortar workable, but that same fineness means it holds water. In Mankato's humid summer stretches, keep your pile covered with plastic sheeting if it'll sit more than a day or two before use, especially before a mortar mixing session where excess moisture throws off your water to cement ratio.
A common mistake is using this sand as paver bedding and expecting it to stay put. Freeze thaw cycles common to zone 5a winters can pump fine sand up through paver joints over a few seasons, which is why more masons here now use angular chip stone for bedding and save this sand for joint filling and mortar work instead.
If your project needs both mortar sand and a coarser bedding material, order them together to consolidate delivery trips. Pairing this sand with crushed base gravel on the same drop saves a second truck visit and gets your whole hardscape base built in one weekend instead of spreading it across two deliveries.
Working With Sand in Mankato
Mankato sits on silty clay loam that holds water and turns heavy after spring rain, which is exactly why a clean sand layer matters under pavers and walkways near Minneopa State Park style stonework. The freeze thaw cycle here, with first frost around October 3 and last frost near May 11, pushes and heaves anything set on native soil alone. Masons in town lean on this sand for mortar because its fine, uniform grain keeps the mix workable in cooler shoulder season temperatures. For paver bedding, more contractors here are shifting to chip stone since it will not pump up through joints the way sand can under freeze thaw pressure.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.