We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Complete Your Outdoor Project
Most jobs pairing sand also need paver base or chip stone underneath it, since chip stone is increasingly replacing sand as bedding because it does not pump or wash out under Milwaukee's freeze thaw cycles. If you're mixing mortar for Cream City brick repair, you'll also want to have your cement and lime ratios sorted before the load arrives. Edging material and polymeric jointing sand are common add ons for finishing paver work.
Service area
Areas we deliver sand in Milwaukee, Wisconsin
For mortar work in Milwaukee, keep your sand covered and dry before mixing whenever possible, especially in spring when snowmelt and rain saturate everything. Wet sand throws off your water to cement ratio and weakens the mortar bond right when you need it strongest, before the next freeze thaw cycle sets in. A tarp over the pile for a day or two before use makes a real difference in workability.
A common mistake with paver joint sand is sweeping it in dry and calling it done. Compact it with a plate compactor and re-sweep at least twice, letting it settle into the joints fully. Skipping this step is why joints open up after the first Milwaukee winter, since freeze thaw cycling exposes any gaps you left behind.
If you're doing paver bedding rather than jointing, ask about chip stone instead. It has replaced traditional sand on a lot of Milwaukee driveways and patios because it locks together and resists the pumping action that pushes sand out from under pavers during freeze thaw seasons. Sand still makes sense for mortar and joints, just not always for the base layer anymore.
Working With Sand in Milwaukee
Milwaukee sits on silty clay that drains slowly, so sand plays a specific role here, it is not for filling low spots in the yard, it is for the precise work under and between pavers and in mortar joints. With clay soil already holding water against foundations, masons here lean on well graded sand to keep mortar workable and consistent, especially with the freeze thaw cycles between the May 10 last frost and the October 1 first frost putting real stress on joints. Pool installers around the city also spec it for smooth, stable bases before liners go down.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.