About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

At a 1 inch depth, one cubic yard covers about 324 square feet, so a small paver patio or pool base project usually needs less than a full yard. For mortar mixing or joint filling, order is based more on total joint volume than surface area, so measure your joint width and depth rather than square footage alone. Most residential jobs in Nesconset run somewhere between a quarter yard and a full yard depending on scope.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Nesconset Sand Delivery

Nesconset Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

At a 1 inch depth, one cubic yard covers about 324 square feet, so a small paver patio or pool base project usually needs less than a full yard. For mortar mixing or joint filling, order is based more on total joint volume than surface area, so measure your joint width and depth rather than square footage alone. Most residential jobs in Nesconset run somewhere between a quarter yard and a full yard depending on scope.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Nesconset Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Sand pairs naturally with paver base stone or crushed gravel for patio and walkway builds, and with portland cement for anyone mixing their own mortar on site. Pool installers often order it alongside a vapor barrier liner. If you are also regrading, a load of topsoil or fill can round out the job.

Mulch Mound Pro Tip

Mason sand is finer and more uniform than concrete sand, which is exactly why it works for mortar, it gives you a smoother, more workable mix that holds a joint line cleanly. If you are pointing brick or block near the Smithtown Library area, do not substitute concrete sand thinking it is close enough, the coarser grains fight the trowel and weaken the bond over a Nesconset winter freeze thaw cycle.

Mulch Mound Pro Tip

A common mistake is using sand as paver bedding and expecting it to stay put. Sand pumps and shifts under freeze thaw cycles, which Nesconset sees every winter starting around November 1. Clean chip stone has largely replaced sand for bedding because it locks together and resists that pumping action, so save your sand order for joints and mortar work instead.

Mulch Mound Pro Tip

Order sand and paver base stone together if you are building a patio, since one truck trip covers both materials and saves a second delivery fee. Time your order for spring through fall when hardscape work is active here, sand left outdoors over a Long Island winter can clump if it gets wet and then freezes, so tarp any leftover pile before the first frost.

Working With Sand in Nesconset

Nesconset sits on sandy loam to start with, so drainage is rarely the issue here, it is more about getting the right sand for the job you are actually doing. Hardscape projects like paver patios and walkways are common in this Long Island hamlet, and mason sand is what makes mortar workable when pointing up a wall or setting joints. Pool installers here also use it to shape a smooth base before liner goes down. With frost showing up around November 1 and lasting into April, most sand work happens in the warmer stretch when concrete and mortar cure properly.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

What is the difference between mason sand and regular sand for my patio project?

Mason sand is finer and more uniform, which makes it ideal for mortar mixing and paver joints where workability matters. For paver bedding under the stones themselves, many contractors now use clean chip stone instead, since it resists the pumping and shifting that sand can develop over a freeze thaw winter.

Answer

How many cubic yards of sand do I need for a small patio?

One cubic yard covers about 324 square feet at a 1 inch depth, so a typical 200 square foot patio joint fill or base layer often needs well under a full yard. Measure your actual area and depth first, then round up slightly since sand settles and compacts during install.

Answer

When is the best time to install sand for a paver or pool project in Nesconset?

Spring through fall is the active season here, since Nesconset sees frost from around November 1 through April 10 and mortar or mason work needs stable, above freezing temperatures to cure properly. Scheduling outside that window risks poor bonding and a mix that never sets right.

Answer

Can your truck deliver sand to a driveway with limited access?

In most cases yes, our trucks place material directly where you need it, but tight driveways or low hanging branches can limit exactly where the load drops. Let us know about any access concerns when you schedule, and clear a path wide enough for a full size delivery truck before the day arrives.

Answer

Should I use sand or chip stone under my pavers?

For paver bedding, many contractors now prefer clean chip stone over sand because it interlocks and does not pump or shift over time. Sand still makes sense for filling the joints between pavers and for mortar mixing, so a real project often uses both materials for different parts of the job.

More delivery around Nesconset, New York

All Nesconset, New York landscape supply