About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar or paver joint work only calls for 1 to 2 inches. For a typical 200 square foot patio joint fill or mortar mixing job, a single yard usually gets you through with some left over. Measure your square footage first, then decide if you are working closer to 1 inch or 2 inches deep before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Oroville Sand Delivery

Oroville Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar or paver joint work only calls for 1 to 2 inches. For a typical 200 square foot patio joint fill or mortar mixing job, a single yard usually gets you through with some left over. Measure your square footage first, then decide if you are working closer to 1 inch or 2 inches deep before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Oroville Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most jobs that call for this sand also need paver base or crushed rock underneath it, since the sand handles the joints and bedding while the base carries the structural load. If you are pouring mortar for stone work, keep some extra on hand since mixed mortar does not store well once it sets up. Some builders are shifting to clean chip stone for paver bedding since it will not pump the way sand can under repeated freeze thaw or heavy foot traffic.

Mulch Mound Pro Tip

For mortar mixing, this finer washed sand is what actually makes a workable mix, unlike coarser concrete sand which fights you with a gritty, crumbly texture. If you are setting stone near the water table around the lake, keep your mortar batches small and mix only what you can place in 30 to 40 minutes, since Oroville's dry summer heat sets mortar faster than you expect.

Mulch Mound Pro Tip

A common mistake is over wetting sand meant for paver joints before it goes down, which causes it to clump and leaves gaps once it dries and settles. Sweep it in dry, then mist lightly after it is packed into the joints. This matters more here than in wetter climates since our low humidity dries the surface fast and can trick you into thinking the joint is fuller than it is.

Mulch Mound Pro Tip

If your project needs both bedding and jointing, ask whether chip stone makes more sense for the bedding layer, since it holds up better under vehicle or heavy foot traffic and will not pump out over time the way sand can. Save the finer sand specifically for joints and mortar where its uniform grain size actually earns its keep instead of using it everywhere out of habit.

Working With Sand in Oroville

Oroville sits on sandy loam already, so this material is not fighting your native soil the way it might in a clay heavy town. That makes it a natural fit for pool base prep and paver joint work where drainage matters and you do not want water pooling under a patio. With hardscape season running spring through fall here and a long frost free stretch from mid March to late November, most jobs get to fully cure and settle before winter rain shows up. People building around the lake and in the foothill neighborhoods tend to use it for exactly these small, precise jobs rather than large scale fill.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

What is this sand actually used for around Oroville homes?

It is used for mortar mixing, filling paver joints, and setting pool bases, not for filling large low spots or building up soil. Its fine, uniform grain makes it workable for mortar and precise enough for tight paver joints, which is different from coarser sands used in concrete work.

Answer

How many cubic yards do I need for a patio joint fill?

One cubic yard covers about 324 square feet at a 1 inch depth. Since most paver joint work only needs 1 to 2 inches, a 300 square foot patio typically needs around 1 cubic yard, and a larger 600 square foot patio may need closer to 2 yards depending on joint depth.

Answer

When is the best time to install paver joints or pour mortar in Oroville?

Spring through fall works best, since that stretch avoids the wetter, cooler months and lines up with our frost free window from mid March to late November. Summer heat sets mortar fast, so plan to mix smaller batches and work efficiently once temperatures climb.

Answer

How does delivery work if my driveway is tight or on a slope?

Let us know your access details when you schedule, since delivery is scheduled at checkout and the truck needs a clear, stable spot to dump the load. Most Oroville properties, including those on the sloped lots near the foothills, work fine as long as there is a flat area near the street or driveway.

Answer

Should I use this sand or chip stone for paver bedding?

Sand has traditionally been used for paver bedding, but chip stone is increasingly preferred since it does not pump out from under pavers over time the way sand can under heavy use. This sand still makes sense for mortar and joint filling where its fine, uniform texture is actually an advantage.

More delivery around Oroville, California

All Oroville, California landscape supply