About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard covers about 54 square feet at a 6 inch depth, and most fill jobs here run 6 to 12 inches depending on how low the area is. For a 10 by 10 foot low spot at 8 inches deep, plan on roughly 2.5 cubic yards. Measure the low area first, decide your target depth, then order by the cubic yard so you are not guessing mid project.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Overland Park Fill Dirt Delivery

Overland Park Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard covers about 54 square feet at a 6 inch depth, and most fill jobs here run 6 to 12 inches depending on how low the area is. For a 10 by 10 foot low spot at 8 inches deep, plan on roughly 2.5 cubic yards. Measure the low area first, decide your target depth, then order by the cubic yard so you are not guessing mid project.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Overland Park Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a cap of topsoil once the grade is built up, since fill dirt is not meant to grow anything on its own. If the area borders a bed or lawn, a few inches of topsoil on top gets it ready for sod or seed. Mulch or gravel around the edges can help hold the new grade where it meets existing landscaping.

Mulch Mound Pro Tip

Place fill dirt in lifts no thicker than 6 to 8 inches and compact each layer before adding the next. Skipping this step is the number one reason yards in this area develop dips and soft spots two or three years later, especially over clay subsoil that already drains slowly. A plate compactor rented for an afternoon is worth it on anything larger than a small backfill job around a post or step.

Mulch Mound Pro Tip

Do not plant directly into fill dirt. It is subsoil, not a growing medium, and grass or shrubs will struggle in it even after a season. Cap the finished, compacted grade with 4 to 6 inches of topsoil before seeding or laying sod. This is especially true in OP where the underlying clay already limits root penetration, so the cap layer matters for anything you want to actually grow.

Mulch Mound Pro Tip

If you are backfilling around a pool or foundation, order a bit more than your calculated volume, since compaction reduces the final height by 10 to 20 percent. It is cheaper to have a little extra on site than to schedule a second delivery for a small top off. Pair the order with topsoil delivery if you are finishing the same week, so both loads are placed before you start grading.

Grading and Filling in Overland Park

OP sits on clay soil that drains slowly, so low areas near foundations, pool decks, and back corners of yards tend to hold water long after a storm passes. Fill dirt solves that by raising the grade, but because the clay underneath is already dense, compaction matters even more here than in sandier areas. A lot of the backfill jobs we deliver for are around new pool installs and additions near the Arboretum area, where grading has to be built up before anyone lays sod or topsoil. Done right, it stops the standing water problem instead of just moving it.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I plant grass directly in fill dirt after grading?

No, fill dirt is subsoil meant for structural grading, not growing. Cap the compacted fill with 4 to 6 inches of topsoil before seeding or laying sod. Planting straight into fill dirt usually leads to poor root development and patchy grass, especially over Overland Park's dense clay base underneath.

Answer

How much fill dirt do I need for a low spot in my yard?

One cubic yard covers about 54 square feet at 6 inches deep. Measure the length and width of the low area, decide how deep it needs to be filled, usually 6 to 12 inches, and calculate from there. A 10 by 10 foot area at 8 inches deep needs roughly 2.5 cubic yards.

Answer

When is the best time to do fill dirt work in Overland Park?

Fill dirt work is project driven, not seasonal, so it can go in any time the ground isn't frozen or saturated. Given the first frost around October 20 and last frost around April 10, working in the shoulder months when clay soil is neither frozen nor waterlogged makes compaction easier and more reliable.

Answer

Where will the delivery truck place the fill dirt?

The truck places the load at the closest accessible point on your driveway or yard, wherever the ground can support it. Clear a path beforehand and note that Overland Park's clay soil gets soft after rain, so a firm, dry drop spot makes for a cleaner delivery and easier cleanup.

Answer

What is the difference between fill dirt and topsoil for my project?

Fill dirt is subsoil used to raise grade and build structural base, while topsoil is the nutrient rich layer used for planting. Use fill dirt to get the grade right, compacted in lifts, then cap it with topsoil wherever grass, shrubs, or garden beds are going in.

More delivery around Overland Park, Kansas

All Overland Park, Kansas landscape supply