We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Complete Your Outdoor Project
Most paver jobs pull from this sand for bedding or joint fill, then pair it with crushed gravel as a base course underneath for drainage. If you are mixing mortar for a stone or brick project, you will also want cement on hand before the load arrives. For pool deck work, some crews are shifting to clean chip stone for bedding since it does not pump the way sand can under repeated freeze thaw cycles.
For mortar mixing in this climate, keep your sand pile covered between batches. Richland's low humidity means surface moisture evaporates fast, and a mortar mix made with sand that dried out overnight will not hydrate evenly the next morning. A basic tarp weighted at the corners solves this and keeps your mix consistent from the first batch to the last.
A common mistake on paver jobs is skipping the compaction step on the sand bedding layer before setting stone. Even with sandy loam soil underneath, an uncompacted bedding layer will settle unevenly within a season, leaving pavers that rock or shift at the joints. Screed it, compact it lightly, then set your pavers rather than setting directly onto loose sand.
If your project only needs joint fill and not a full bedding layer, consider ordering a smaller quantity and pairing it with chip stone for the base course underneath. Chip stone drains better and resists the pumping action that pushes sand out from under pavers over repeated wet seasons, which stretches the life of the job without adding much to the order.
Working With Sand in Richland
Richland sits on sandy loam already, so this material is not fighting your native soil the way it would in a clay heavy region. That makes it a natural fit for paver base work and mortar mixing where you want predictable drainage and a uniform texture. Because the growing season here runs long, from last frost in mid April to first frost in late October, hardscape projects have a wide build window before ground freeze becomes a concern. At 404 feet elevation with mild winters for the region, sand stays workable later into the season than in colder inland climates.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.