Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a ni...
Read full review
The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a nice mound of mulch in my driveway. Great service - just as promised.
This was the easiest process to purchase mulch! It arrived on time and the driver did an amazing job putting it exactly where I wanted it. I will b...
Read full review
This was the easiest process to purchase mulch! It arrived on time and the driver did an amazing job putting it exactly where I wanted it. I will be a return customer for sure.
Complete Your Outdoor Project
Most paver jobs around Rome pair this sand with a base layer of crushed stone or clean chip stone underneath, since chip stone doesn't pump moisture up through the joints the way sand bedding can over time. Mortar jobs pair naturally with masonry sand and portland cement bought separately. If you're doing a pool base, a layer of screened stone below the sand helps with drainage given how much rain this region gets in spring.
Mason sand pulls moisture out of the air fast in Georgia's humidity, especially between April and November, so if you're mixing mortar, keep the pile covered with plastic sheeting between batches. A pile left open overnight in Rome's summer humidity can clump enough to throw off your water ratio the next morning, which shows up as weak, crumbly joints later.
A common mistake on paver patios here is using mason sand as bedding sand under the pavers themselves instead of just in the joints. It's too fine for a structural base and will shift under red clay's freeze thaw cycles come winter. Use crushed stone or chip stone for the base layer and save the mason sand strictly for filling joints on top.
If you're doing both a pool base and mortar work on the same property, order them together as one delivery instead of two separate loads. The sand itself doesn't change between uses, so consolidating saves a trip and lets you use leftover material from one project as a buffer for the other instead of running short mid job.
Working With Sand in Rome
Rome sits on those seven hills with a lot of red clay and sandy loam underneath, which is fine for planting beds but does nothing for mortar or paver joints, both of which need a uniform, washed sand instead. Masons working on the older brick and stone construction around downtown Rome rely on mason sand for tuckpointing and repair work where the mix has to stay workable in Georgia's humidity. Pool builders here also spec this sand for a smooth, uniform base under the liner. It is not a fill sand, it is a finishing material, so the depth stays shallow and the quality matters more than the volume.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.