About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard covers about 54 square feet at a 6 inch depth, so a 10 by 10 area needing 6 inches takes roughly two yards, and doubling the depth to 12 inches roughly doubles the yardage. Measure the low area's length and width, decide how many inches you need to raise it, and size the order from there. It's sold by the cubic yard, so round up rather than short a lift you'll need to finish later.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Roswell Fill Dirt Delivery

Roswell Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard covers about 54 square feet at a 6 inch depth, so a 10 by 10 area needing 6 inches takes roughly two yards, and doubling the depth to 12 inches roughly doubles the yardage. Measure the low area's length and width, decide how many inches you need to raise it, and size the order from there. It's sold by the cubic yard, so round up rather than short a lift you'll need to finish later.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Roswell Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a few inches of topsoil capping the fill once it's compacted, since fill dirt alone won't support grass or plants. If the project involves a retaining wall or a slope near the clay-heavy areas around Roswell, some crushed stone at the base helps with drainage before the fill goes in.

Map of the fill dirt delivery area around Roswell, Georgia

Service area

Areas we deliver fill dirt in Roswell, Georgia

Mulch Mound Pro Tip

Roswell's red clay compacts hard once it's dry but turns greasy and unstable when wet, so don't dump fill on top of saturated clay and expect it to bond. Scrape any standing water or mud off the area first, and if you're filling right after a rain, give the base a day or two to firm up. Compacting fill against a soft, wet clay subgrade is the most common reason people see settling months later.

Mulch Mound Pro Tip

The biggest mistake we see is people filling 12 inches in one pass instead of two 6 inch lifts. Loose fill dumped deep looks fine at first but settles unevenly as it compacts under its own weight over the following year, leaving dips right where you didn't want them. Compact each lift with a plate compactor or hand tamper before adding the next one, especially under anything that'll carry weight like a patio or shed.

Mulch Mound Pro Tip

If you're building up a large low area, order fill dirt for the bulk of the depth and cap only the top 2 to 4 inches with topsoil where grass or plants need to grow. This costs less than filling the whole area with topsoil, since fill dirt is a subsoil product and doesn't need the organic content topsoil carries. Save the topsoil budget for the layer that actually needs to support root growth.

Grading and Filling in Roswell

Roswell sits on red clay that already drains slowly, so any project that adds elevation, a pool deck, a shed pad, a low corner of the yard, needs fill that compacts predictably instead of settling unevenly against that clay base. At 1060 feet with rolling terrain around Bulloch Hall and the older neighborhoods, a lot of lots have natural low points where water collects after storms. Fill dirt gets used to correct that grade before topsoil or sod goes back on top. It is not a growing medium, so treat it as the structural layer underneath whatever the finished surface will be.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Roswell?

Yes, fill dirt is the right material for raising low spots and leveling grade, especially over Roswell's clay-heavy soil where water tends to pool. Place it in compacted 6 to 8 inch lifts rather than one deep layer, and cap the finished grade with topsoil if you plan to plant grass or landscaping over it.

Answer

How many cubic yards do I need to fill a low spot in my yard?

One cubic yard covers about 54 square feet at 6 inches deep. Measure the length and width of your low area, decide your target depth, and scale from there, for example a 200 square foot area at 6 inches needs roughly 3.7 cubic yards, so most people round up to 4.

Answer

Do I need to compact fill dirt before building on it?

Yes, especially if anything will sit on top of it, like a patio, shed, or pool deck. Place it in 6 to 8 inch lifts and compact each one before adding the next, otherwise the fill settles unevenly over time as it works its way down through the layers, which shows up as dips or cracks later.

Answer

Where will the delivery truck place the fill dirt on my property?

The truck drops the load at a clear, accessible spot you designate, usually a driveway or curbside area, since it can't drive over lawns or soft ground without risking ruts. Delivery is scheduled at checkout, and it helps to have the drop zone clear and any gates opened ahead of time.

Answer

What's the difference between fill dirt and topsoil for my project?

Fill dirt is subsoil meant for structural jobs like raising grade or backfilling, it's not meant to grow anything in. Topsoil has the organic content plants need and goes on top as a finishing layer. Most grading projects use fill dirt for the bulk of the depth and a few inches of topsoil on top where grass or plants are going in.

More delivery around Roswell, Georgia

All Roswell, Georgia landscape supply