I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Highest compliments. Great driver.
Website is easy to navigate. Just a seamless process. 5 stars!!
I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).
Complete Your Outdoor Project
Most jobs using this sand also need paver base or crushed stone underneath, and often a top dressing of polymeric sand or chip stone for the finished joints. If you're mixing mortar on site, cement and a mixing tub or mortar box round out the setup. Pairing the base material and the finish sand from the same delivery keeps timing simple.
Service area
Areas we deliver sand in Seaford, New York
Mason sand is finer and more uniform than concrete sand, which is exactly why it works for mortar but not for load bearing paver bedding. If you're setting a patio near the water table in Seaford where ground movement is more common, use chip stone or a coarser bedding sand underneath and save this sand for the joints and mortar work where fine grain actually helps.
A common mistake is ordering mason sand for paver bedding out of habit. It doesn't lock together or drain the way coarser material does, and in Seaford's sandy loam, poor drainage under a patio shows up fast as settling after a wet fall. Use it for joints, mortar, and pool base work, and let a coarser aggregate handle the structural bedding layer.
Buying a slightly larger cubic yardage than your immediate job needs is often worth it since dry sand stores fine under a tarp for later touch ups or a second phase like a walkway extension. Combining a mason sand order with a base stone delivery on the same trip also saves you from scheduling two separate deliveries for one hardscape project.
Working With Sand in Seaford
Seaford sits low, about 10 feet of elevation, on sandy loam that already drains fast, so this isn't a soil amendment material here, it's a build material for mortar and joints. With a first frost around Nov 17 and hardscape season running spring through fall, most orders come in ahead of patio and paver projects rather than for lawn work. The fine, uniform grain is what makes mortar workable when you're setting stone or brick near the coast. It's not meant for bedding under pavers, that's better handled with chip stone these days.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.